Sign In
Upload
Manuals
Brands
VERDER Manuals
Furnace
3508
VERDER 3508 Manuals
Manuals and User Guides for VERDER 3508. We have
2
VERDER 3508 manuals available for free PDF download: Installation, Operation And Maintenance Instructions
VERDER 3508 Installation, Operation And Maintenance Instructions (80 pages)
1200 C Split Tube Furnace + 3508 Controller + 2132 End Zone Controllers
Brand:
VERDER
| Category:
Furnace
| Size: 5 MB
Table of Contents
Table of Contents
2
Program Example
2
1 Symbols and Warnings
6
Switches and Lights
6
General Warnings
6
2 Installation
8
Unpacking and Handling
8
Siting and Setting up
8
Electrical Connections
11
3508 Controller
14
PID Control
14
3508P1
14
3508P10
14
3508P25
14
Basic Operation
15
Controller Layout
16
Keys
16
Quick Start Guide
16
Operation as a Simple Controller
16
Changing the Setpoint
16
Resetting the Programmer
17
Understanding User Levels
17
Setting up Controller
18
Maximum Output Power Setting
18
Customer ID
18
Units
19
Language
19
Programming
19
Programming Notes
19
Holdback
20
Wait Segments
20
Program Cycling
21
Creating a Program
21
Running a Program
22
To Pause (Hold) a Program
23
To Stop and Reset a Program
23
To Run a Different Program (P10 and P25)
23
Program Status
23
Program Hold with Holdback
24
Power Failure Recovery
24
Alarms
25
Program Example
25
Controller Options
29
Digital Communications - RS232
30
Digital Communications - RS485
30
Comms Address
30
Alarm Option
30
Remote Input and Output (Analogue Communications)
31
Program Segment Output
31
Temperature Controller Replacement
32
Controller Navigation Diagrams
32
Operator Level 1 - no Program Running
33
Operator Level 1 - Program Running
34
Supervisor Level
35
3508 Dual Loop Cascade Control (if Fitted)
36
Principle of Cascade Control
36
Operation of Cascade Control
36
Bypassing Cascade Control
40
3508P1 Element Loop (Loop 2)
40
Caution
40
Over-Temperature Control
40
2132 Controller
41
Description
41
2132 Controller Operation
41
Controls
41
2132 Controller Operation
42
Basic Operation
42
Altering the Setpoint
42
Stopping and Starting Control
43
Altering the Ramp Rate
43
Operating with the Timer
44
Setting the Timer Mode
46
Setting the Time Period
46
Running with the Timer
46
Stopping the Timer
47
End of Time Period
48
Cancelling the Alarm
48
Program Example
48
Altering Power Limit
48
Audible Alarm
51
Temperature Controller Replacement
51
Navigation Diagram
52
2132 Over-Temperature Controller Description (if Fitted)
54
Description
54
Operation
54
Controls
54
Operation
55
Over-Temperature Operation
55
Over-Temperature Alarm
55
Resetting the Over-Temperature Alarm
55
Sensor Break
55
Audible Alarm
56
Navigation Diagram
56
7 Operation
57
Operating Cycle
57
Control Method
57
3-Zone Control Methods
58
Back-To-Back Thermocouples
59
Retransmission of Setpoint
59
Independent Control
60
General Operating Advice
60
Operator Safety
60
Tube Life
61
Pressure
61
Power Adjustment
62
Running at Low Temperatures
62
8 Maintenance
63
General Maintenance
63
Maintenance Schedule
63
Cleaning
65
Safety Switch
65
Calibration
65
After-Sales Service
66
Recommended Spare Parts and Spare Parts Kit
66
9 Repairs and Replacements
67
Safety Warning - Disconnection from Power Supply
67
Safety Warning - Refractory Fibre Insulation
67
Temperature Controller Replacement
67
Solid-State Relay Replacement
68
Thermocouple Replacement
68
Fuse Replacement
68
Element Replacement
69
10 Fault Analysis
70
Furnace Does Not Heat up
70
Product Overheats
71
11 Wiring Diagrams
72
2- and 3-Phase with Neutral
74
Independent Zones (Control Method C)
74
Control by Broadcast Comms (Control Method B)
74
Three-Phase Without Neutral (Star - E.g. 380-415 V)
74
Higher Voltages
75
12 Fuses and Power Settings
76
Fuses
76
Power Settings
76
User Power Setting Adjustments
77
13 Specifications
78
Environment
78
Advertisement
VERDER 3508 Installation, Operation And Maintenance Instructions (36 pages)
1000 C CO2 Reactivity Furnace 1 3508 Controller
Brand:
VERDER
| Category:
Furnace
| Size: 8 MB
Table of Contents
Table of Contents
2
Warnings
4
General Warnings
4
Installation
5
Unpacking and Handling
5
Siting and Setting up
5
Electrical Connections
6
Gas Supply Connections
7
Glass Retort Thermocouple
9
Operation
11
Operating Cycle
11
General Operating Advice
15
Recovery of Glass Retort
16
Over-Temperature
17
Adjustment of Reaction Time
18
Power Adjustment
19
Temperature Controller
20
Maintenance
21
General Maintenance
21
Maintenance Schedule
21
Maintenance Schedule
23
Cleaning
25
Calibration
25
After-Sales Service
25
Recommended Spare Parts and Spare Parts Kit
25
Repairs and Replacements
26
Safety Warning - Disconnection from Power Supply
26
Safety Warning - Refractory Fibre Insulation
26
Temperature Controller Replacement
26
Thermocouple Replacement
27
Solid-State Relay Replacement
27
Fuse Replacement
27
Element Replacement
28
Fault Analysis
29
Furnace Does Not Heat up
29
Product Overheats
30
Wiring Diagrams
31
Fuses and Power Settings
32
Fuses
32
Power Settings
32
Specifications
33
Environment
33
Advertisement
Related Products
VERDER CARBOLITE GERO 3508P1
VERDER CARBOLITE GERO 3508P10
VERDER CARBOLITE GERO 3508P25
VERDER CARBOLITE GERO 3216P1
VERDER CARBOLITE GERO 3216P5
VERDER 3216
VERDER Verderflex Vantage 3000 C Series
VERDER 2132
VERDER 2416
VERDER AAF 11/7
VERDER Categories
Furnace
Oven
Water Pump
Laboratory Equipment
Swimming Pool Pump
More VERDER Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL