Sign In
Upload
Manuals
Brands
Ssab Manuals
Construction Equipment
RD320
Ssab RD320 Manuals
Manuals and User Guides for Ssab RD320. We have
1
Ssab RD320 manual available for free PDF download: Installation Manual
Ssab RD320 Installation Manual (54 pages)
Brand:
Ssab
| Category:
Construction Equipment
| Size: 5 MB
Table of Contents
Table of Contents
2
1 General
4
2 Ssab's STEEL PILES
4
Steel Grades and Standards
4
Small Diameter RR and Rrs Piles
5
Structure, Steel Grades and Identification
5
Pile Sections, Pipes and Splices
5
Pile Shoes
6
Large Diameter RR Piles
7
Structure, Dimensions and Availability of Steel Grades
7
Pile Shoes
8
RD and Rds Piles
9
Structure, Dimensions, Steel Grade Selection and Identification
9
Splicing and Steel Grade Selection of RD Piles
10
Shaft Grouted RR Piles (CSG-RR Piles)
11
Bearing Plates
12
Pile Dimensions and Geometrical Sectional Properties
12
3 Design Standards and Implementation Control
14
4 Recommendations for the Selection and Design of Pile Type, Pile Size and Piling Class for Different Applications
14
5 Structural and Geotechnical Design of Piles
15
Limit States of Pile Foundations to be Considered
15
Design Process of a Steel Pile Foundation
15
Actions and Design Situations
16
Geotechnical Investigations
16
Dimensioning Methods and Analyses of Geotechnical Resistance
16
Selection of Geotechnical Dimensioning Method for Steel Piles
16
Stiffness of a Piled Structure
16
Resistances Determined by Stress Wave Analysis
17
Resistances Determined by Dynamic Load Tests
17
Resistances Determined by Pile Driving Formulas
17
Resistances Determined on the Basis of Ground Test Results
18
Resistances Determined by Static Load Tests
19
Geotechnical Dimensioning of Tension Piles
19
Structural Resistance
19
Resistance of RR Piles During Installation
19
Structural Resistance During Service
20
Corrosion
20
Vertical Displacements of Pile Foundation
22
Considering Downdrag (Negative Skin Friction) in Dimensioning
22
Transversely Loaded Steel Piles
23
Short Piles
23
Dimensioning Tables for RR and Rrs Piles, Pile Sizes RR75 to RR320/12.5
23
Dimensioning Tables for RD and Rds Piles, Rd/Rds90 to RD320/12.5
23
6 Design of Pile Foundations
26
Attachment of Piles to Superstructure
26
Centre-To-Centre Distances between Steel Piles
26
Distance between Side of Pile Footing and Piles
26
Distances between Piles and Other Structures
26
Pile Inclinations
27
Allowed Positional and Angular Deviations
27
Impact of Piling on Previously Installed Piles, Other Foundation Structures and Immediate Surroundings
28
7 Piling
28
Material Needed for Piling: Working Plan and Quality Plan
28
Storage, Handling, Inspection and Erection of Steel Piles
28
Installation of RR Piles
29
Piling Equipment
29
Start of Installation
31
Penetration Blows and Allowed Driving Stresses
31
Additional Installation Instructions and Splicing of RR75 to RR220 Piles
32
Additional Instructions for the Installation of RR270 to RR1200 Piles
32
Additional Instructions for Rock Shoes with Hollow Dowel
32
End of Driving of an End-Bearing Pile with a Drop or Hydraulic Hammer
33
End of Driving of an End-Bearing Pile with a Hydraulic Ram or Pneumatic Hammer
33
Preparation of End-Of-Driving Instructions for Large Diameter Piles in Piling Classes PTL3 and PTL2
34
Final Blows on Friction Piles
34
Project-Specific Driving Instructions
34
Installation of Jacked-RR Piles
34
Installation of RD Piles
34
Piling Equipment and Drilling Methods
34
Start of Installation
35
Drilling of RD Piles
35
Handling and Installation of Threaded RD Pile Sections and Threaded Sleeves
37
Splicing of Steel Pipe Piles by Welding
38
Welding Plan
38
Welding Quality Requirements
38
Qualification of Welders
39
Welding Procedures
40
Welding Consumables
40
Welding Conditions
40
Joint Preparation
41
Preheating
42
Welding
42
Inspection of Welded Splices
42
Pile Cut-Off
43
Pile Cleaning
43
Reinforcement and Concreting of Piles
43
Bearing Plate Installation
44
Installation of Shaft Grouted CSG-RR Piles
44
Installation Equipment
44
Driving of Pile into Soil and Its Splicing
44
Grout Injection
44
8 Supervision and Quality Control of Piling Work, Measurements
45
Supervision and Monitoring of Piling Work
45
Quality Control of Materials
45
Monitoring Measurements During Installation
45
Testing of Piles
46
9 Documentation of Piling Work
46
General
46
Piling Records
46
Outcome Drawing and Other Piling Documents
46
10 Work Safety and Environmental Protection
46
11 End-Of-Driving Tables
47
General
47
Drop and Hydraulic Hammers
47
Basics of Modelling
47
Instructions for Use of End-Of-Driving Tables
47
Hydraulic Rams and Pneumatic Hammers
48
Principles of Modelling
48
Instructions for Use of End-Of-Driving Graphs and Tables
48
Of Large Diameter RR Piles
50
Advertisement
Advertisement
Related Products
Ssab RD320/10
Ssab RD320/12.5
Ssab RD115
Ssab RDs100
Ssab RD170
Ssab RD220
Ssab RD650
Ssab RDs115/6.3
Ssab RD270/10
Ssab RD1000
Ssab Categories
Construction Equipment
More Ssab Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL