Sign In
Upload
Manuals
Brands
Spirent Manuals
Network Hardware
VisionWorks 7562
User Manuals: Spirent VisionWorks 7562 Test Equipment
Manuals and User Guides for Spirent VisionWorks 7562 Test Equipment. We have
1
Spirent VisionWorks 7562 Test Equipment manual available for free PDF download: Installation And Setup Manual
Spirent VisionWorks 7562 Installation And Setup Manual (84 pages)
Brand:
Spirent
| Category:
Network Hardware
| Size: 0 MB
Table of Contents
Table of Contents
3
Introduction
11
Important Safety Notes
11
About this Document
13
Purpose and Scope
13
Intended Audience
13
Document Changes
13
Table 1-1 Issue 7 (Fw V14.20, November 2022) - Technical Content Changes
13
Table 1-2 Issue 6 (Fw V13.90, December 2021) - Technical Content Changes
13
Conventions
14
Table 1-3 Issue 5 (Fw V13.80, September 2021) - Technical Content Changes
14
Table 1-4 Issue 4 (Fw V13.60, March 2021) - Technical Content Changes
14
Table 1-5 Issue 3 (Fw V13.30, June 2020) - Technical Content Changes
14
Table 1-6 Issue 2 (March 2020) - Technical Content Changes
14
Table 1-7 Issue 1 (July 2019) - Technical Content Changes
14
Related Documents
15
Technical Assistance
15
Table 1-8 Related Spirent Documents
15
Product Overview
17
Warnings and Symbols
17
Table 2-1 Symbols and Warnings
17
Product Purpose and Architecture Notes
18
Typical Unit Configuration (Wiring/Connectivity)
19
Figure 2-1 Visionworks Probe and an Ethernet Network - Example
19
Access Device Notes
20
Figure 2-2 Typical Physical Configuration (DC Powered Units)
20
Physical Description
21
Main Chassis Features - Front View
21
Figure 2-3 Chassis Front View
21
Figure 2-4 MANAGEMENT Port Leds
22
Figure 2-5 CONSOLE Port Leds
22
Main Chassis Features - Rear View
23
Figure 2-6 Chassis Rear View (DC Powered Unit)
23
Factory-Assigned Management IP Addresses
24
Physical Port Pinouts
24
Asynchronous Port Pinout (CONSOLE)
24
Figure 2-7 CONSOLE (RJ45 Async) Port
24
TCP/IP Ethernet Management Port Pinout (MANAGEMENT)
25
Table 2-4 Async (CONSOLE) Port Pinout
25
Table 2-5 MANAGEMENT Port Pinout
25
Commands
26
Unit Configuration/Administration Commands
26
Test Access Commands
28
Table 2-7 Access Commands
28
Data Testing Commands
29
Table 2-8 On-Demand Testing
29
Table 2-9 "PM" Active Tests
30
Table 2-10 Loopbacks and Servers
31
Table 2-11 Passive Data Testing Commands
32
Detailed Specifications
33
Dimensions and Weight
33
Power and Overcurrent Protection
33
Temperature
34
Regulatory Compliance
34
Rohs Table
35
Site Planning and Engineering
37
Rack Space Requirements
38
Power and Fusing Information
38
Mounting
38
ESD Notes
38
General Installation Notes
39
Required Tools and Equipment
39
Documentation Requirements
39
Unpacking and Inspection
40
Rack Ear Installation
40
Mounting Procedure
41
Figure 3-1 Front-Mount Rack Ear Installation
41
Figure 3-2 Center-Mount Rack Ear Installation
41
Wiring Connections
42
Optical Transceivers
42
Management and Test Interface Wiring
43
Chassis Ground Connection
43
Figure 3-3 Removal/Installation of a QSFP-Style Transceiver
43
Figure 3-4 Ground Terminal Connection on Rear of Unit
44
DC Power Wiring (DC-Powered Models)
45
Figure 3-5 Ground Terminal Connection on Equipment Rack
45
Figure 3-6 -48 VDC Power Connections
47
AC Power Cord Connection and Retaining Clip
48
Figure 3-7 AC Power Cord Connection - Insert the Cord
49
Powering up and Shutting down the Unit
50
Figure 3-8 AC Power Cord Connection - Mount the Clip
50
General Operation
53
About RTU Mode and an OSS Architecture
53
4: Verification and Configuration
53
Basic Management Communications
54
Conducting Async Management Communications
54
Figure 4-1 RTU Mode Access
54
Preparations for Async Communications over USB
55
Manually Installing the USB Driver (One-Time Task)
55
Connecting the Cable
56
Accessing a TL1 Prompt
56
Figure 4-2 Connection to a Serial Port
56
Conducting Ethernet Management Communications
57
About the Onboard DHCP Server
59
About In-Band Management
60
Powering up and Shutting down the Unit
61
Setting the Unit Date and Time
61
Static Date/Time Configuration
62
Network Time Protocol (NTP)
62
Precision Time Protocol (PTP)
63
Time Zones Supported for Network Time
64
Post-Installation Configuration and Verification
69
Physical Configuration Verification
69
Postinstallation Configuration (Unit Provisioning)
70
Functional Testing Procedures
74
Initial Circuit/Service Access (Active or Passive)
74
Passive Testing (Top Talkers)
76
Active Testing (Ping)
77
Disconnecting the Test Session and Logging off
78
Maintenance
81
Firmware Updates
81
Maintenance (Fan Filter)
81
Returning a Defective Unit for Service
82
Maintenance Agreement
83
Advertisement
Advertisement
Related Products
Spirent VisionWorks 7528
Spirent A2-400
Spirent A3-400
Spirent B2-800-QD-4-T1S
Spirent C1
Spirent CF400
Spirent DLS 6700
Spirent TestCenter
Spirent Categories
Network Hardware
Computer Hardware
Test Equipment
Network Router
Portable Generator
More Spirent Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL