Sign In
Upload
Manuals
Brands
Shini Manuals
Industrial Equipment
SG-24E Series
Shini SG-24E Series Manuals
Manuals and User Guides for Shini SG-24E Series. We have
1
Shini SG-24E Series manual available for free PDF download: Manual
Shini SG-24E Series Manual (61 pages)
Standard Screenless Granulators
Brand:
Shini
| Category:
Industrial Equipment
| Size: 1 MB
Table of Contents
Table of Contents
3
General Description
9
Coding Principle
10
Feature
10
Technical Specifications
12
Dimensions
13
Picture 1-1:Tooth Pitch Cutters
13
Picture 1-2:Dimensions
13
Safety Regulations
14
Safety Signs and Labels
14
Transportation and Storage of the Machine
16
Exemption Clause
17
Structural Features and Working Principle
19
General Description
19
Working Principle
19
Picture 2-1:Working Principle
19
Safety System
20
Emergency Stop Switch
20
Picture 2-2:Safety System
20
Safety Switch
21
Lock
21
Picture 2-3:Emergency Stop Switch
21
Picture 2-4:Safety Switch
21
Assembly Drawing
23
Assembly Drawing (SG-2417E)
23
Picture 2-5:Assembly Drawing (SG-2417E)
23
Parts List (SG-2417E)
24
Assembly Drawing (SG-2427E(H))
25
Picture 2-6:Assembly Drawing (SG-2427E(H))
25
Parts List (SG-2427E(H))
26
Assembly Drawing (SG-2436E(H))
27
Picture 2-7:Assembly Drawing (SG-2436E(H))
27
Parts List (SG-2436E(H))
28
Cutting Chamber
29
Cutting Chamber Parts List
29
Picture 2-8:Cutting Chamber
29
Blade Rest
30
Picture 2-9:Blade Rest
30
Transmission Parts
31
Transmission Parts List
31
Picture 2-10:Transmission Parts
31
Feed Box, Sound Insulation Box and Check Plate
32
Feed Box, Sound Insulation Box and Check Plate Parts List
32
Storage Box
32
Storage Box Parts List
32
Picture 2-11:Feed Box, Sound Insulation Box and Check Plate
32
Picture 2-12:Storage Box
32
Main Body
33
Main Body Parts List
33
Picture 2-13:Main Body
33
Electrical Diagram
34
Main Circuit
34
Picture 2-14:Main Circuit
34
Electrical Components List
35
Optional Accessories
36
30-Second Instant Recycle System
36
Picture 2-15:30 Second Instant Recycle System
36
Proportional Valve
37
Manual Collective Storage Box
38
Picture 2-16:Control Box, Valve Body
38
Picture 2-17:Manual Collective Storage Box
38
Installation and Debugging
39
Installation Notice
40
Picture 3-1:Installation Space
40
Installation Place
41
Installation of Bearing and Blade Rest
41
Picture 3-2:Installation Place
41
Picture 3-3:Installation of Bearing and Blade Rest 1
41
Installation of Motor
42
Picture 3-4:Installation of Bearing and Blade Rest 2
42
Picture 3-5:Installation of Motor 1
42
Installation of Rotating Blade and Fixed Blade
43
Picture 3-6:Installation of Motor 2
43
Picture 3-7:Installation of Rotating Blade and Fixed Blade 1
43
Picture 3-8:Installation of Rotating Blade and Fixed Blade 2
43
Installation of Feed Box, Feed Throat and Storage Box
44
Picture 3-9:Installation of Rotating Blade and Fixed Blade 3
44
Picture 3-10:Installation of Feed Box, Feed Throat and Storage Box 1
44
Picture 3-11:Installation of Feed Box, Feed Throat and Storage Box 2
44
Picture 3-12:Installation of Feed Box, Feed Throat and Storage Box 3
45
Picture 3-13:Installation of Feed Box, Feed Throat and Storage Box 4
45
Operation Guide
46
Startup Pretest
46
Before the First Startup
46
After First Startup for 2 Hours
46
After First Startup for 20~30 Hours
46
Circuit Connection
46
Check the Running Direction of the Motor
47
Opening the Feed Box and the Storage Box
47
Opening the Feed Box
47
Opening the Storage Box
48
Closing the Feed Box and the Storage Box
48
Closing the Feed Box
48
Closing the Storage Box
48
Picture 4-1:Opening the Feed Box
48
Picture 4-2:Opening the Storage Box
48
Start and Stop the Granulator
49
Picture 4-3:Motor Circuit
49
Trouble Shooting
50
Granulator Doesn't Run
50
Other Reasons for Shutdown
51
Maintenance and Repair
52
Preservation
52
Replace the Blades
52
Picture 6-1:Replace the Blades
52
Picture 6-2:Remove the Fixed Blades
53
Picture 6-3:Remove the Rotating Blades
53
Transmission
54
Routine Preservation of Reducer
54
Preservation
54
Daily Check
54
Weekly Check
55
Monthly Check
55
Cleaning
55
Maintenance Schedule
57
About the Machine
57
Check after Installation
57
Daily Check
58
Weekly Check
59
Monthly Check
60
Half-A-Year or 1000-Hour-Running Check
61
Advertisement
Advertisement
Related Products
Shini Budget SG-24EB Series
Shini SG-24N
Shini SG-2427N
Shini SG-2436N
Shini SG-2446N
Shini SG-2417EB
Shini SG-2427E
Shini SG-2436E
Shini SG-2436EH
Shini SG-2436EB
Shini Categories
Industrial Equipment
Dryer
Chiller
Water Heater
Heater
More Shini Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL