Sign In
Upload
Manuals
Brands
Shimadzu Manuals
Oven
CTO-20A
Shimadzu CTO-20A Manuals
Manuals and User Guides for Shimadzu CTO-20A. We have
1
Shimadzu CTO-20A manual available for free PDF download: Instruction Manual
Shimadzu CTO-20A Instruction Manual (186 pages)
COLUMN OVEN FOR SHIMADZU HIGH PERFORMANCE LIQUID CHROMATOGRAPH
Brand:
Shimadzu
| Category:
Oven
| Size: 7 MB
Table of Contents
Warranty and After-Sales Service
4
Safety Instructions
6
Application Precautions
6
Installation Site Precautions
7
Installation Precautions
8
Operation Precautions
9
Precautions for Instrument Inspection, Maintenance, Adjustment and Care
10
Static Electricity Precautions
11
Preventing Static Electricity Accidents
12
For Reference
14
Precautions for Mobile Phase Selection and Use
15
Warning Labels
16
Table of Contents
17
Overview
26
Features
26
Component Parts
27
Optional Parts
28
Front Cover
30
Parts Identification and Function
30
Opening and Closing the Left Door
31
Opening the Left Door
31
Closing the Left Door
32
Interior
33
Back
34
Names and Functions of Displays and Keypad
35
Display Panel
35
Keypad
36
Installation Procedures
39
Column Installation
40
Installation with Column Clips
40
Installation with Column Clamps (Optional)
42
Turning Power ON/OFF
44
Basic Operation
44
Setting Operating Temperature [SET TEMP]
45
Setting Upper Temperature Limit [T.MAX]
46
Operation
47
Application Operation
50
Display Panel
50
Types of Screens
50
Product Info
50
Auxiliary Functions Screens
51
VP Function Screens
54
Parameter in Auxiliary Functions
58
List of Auxiliary Functions
58
Parameter Settings Groups
58
Monitor Settings Groups
58
System Settings Groups
59
Showing the Auxiliary Function Screen
60
Parameter Settings Group
61
[Set Temp]
61
[T.max]
61
Event
61
[Rv Left, Rv Right]
62
Monitor Settings Group
63
Ambient
63
Ls Level
63
Prog Time
63
Monitor Rv
64
System Settings Group
65
Local
65
Link Adrs
65
Key Close
66
Brightness
66
Ext-S
67
[COOLER MODE] (Available Only for CTO-20AC)
67
Ready Range
68
Wait Time
68
Fan Speed
69
Beep Mode
69
VP Functions
70
List of VP Functions
70
Product Information Group
70
Maintenance Information Group
70
Validation Support Group
71
Calibration Support Group
71
Displaying the VP Functions
72
Product Information Group
73
Serial Number
73
[S/W ID]
73
Maintenance Information Group
74
Total Op Time
74
Part Replacement
74
Maintenance Log
74
Operation Log
75
Error Log
75
Validation Support Group
76
[Date]
76
Time
77
Memory Check
77
Temperature Test
78
[Leak Sensor]
78
Calibration Support Group
79
Input PASSWORD
79
Temp1 Calib 50.0
79
Temp2 Calib 50.0
79
Leak Thr
80
Op Mode
80
Initialize Param
80
Change Password
81
New Password
81
Creating Time Programs
82
Time Program Command
82
Basics of Programming
82
Time Program Flow
83
Setting a New Program
83
Setting Functions
84
[TEMP (Operating Temperature)]
84
[TMPL (Setting Linear Temperature Regulation)]
84
[ON (Oven ON) / off (Oven OFF)]
85
Adding Steps for Time Program
86
Deleting Steps
87
STOP (Ending a Time Program)
87
[EVNT (EVENT Output ON/OFF)]
88
[RV-L, RV-R (Setting the Automatic Column Switching Valves)]
88
Loop
89
Creating a Typical Time Program
90
Creating a Typical Time Program2 -Linear Temperature Regulation
93
Starting a Time Program
95
Stopping a Time Program
95
Control by CBM-20A or CBM-20Alite System Controller
96
Preparation
96
Basic Parameters
96
Control by SCL-10Avp or SCL-10A System Controller
97
Preparation
97
Basic Parameters
97
Attention
97
Connection to External Input/Output Terminals
98
External Input/Output Terminals
98
Connection of Event Cable
99
Chapter 6 Troubleshooting
101
Troubleshooting and Corrective Action
102
Error Messages
103
Chapter 7 Hardware Validation
107
Overview of Hardware Validation
108
Hardware Validation
108
Types of Hardware Validation
108
Implementation of Hardware Validation
109
Periodic Validation
109
Daily Inspection
109
Validation after Maintenance
109
Validation Precautions
110
Environment
110
Installation Site
110
Equipment Required for Validation
111
Testing Equipment
111
Standard Reagents for Validation
112
Hardware Testing Supplies
112
Validation : Column Oven
113
Check Terms
113
ROM, RAM Self Diagnosis
113
Objective
113
Check Procedure
113
Firmware Version Check
114
Objective
114
Check Procedure
114
Display, LED Test
114
Setting Temperature Accuracy and Regulation Accuracy (40/50°C) Check
115
Objective
115
Items Required for Check
115
Connection of Check Items
115
Check Procedure
116
Setting Temperature Accuracy and Regulation Accuracy (Room Temperature 5°C) Check
118
Objective
118
Items Required for Check
118
Connection of Check Items
118
Check Procedure
119
Objective
121
Check Procedure
121
Temperature Accuracy Calibration
123
System Validation
125
Validation of Isocratic LC System
125
Objective
125
Items Required for Validation
125
Checking and Preparing the LC System
126
Validation Procedure
127
Parameter Settings for Isocratic System Validation
128
Validation of Gradient LC System
129
Objective
129
Items Required for Validation
129
Checking and Preparing the LC System
129
Validation Procedure
130
Parameter Settings for Gradient System Validation
132
If Validation Fails
133
Chapter 8 Maintenance
135
Periodic Inspection and Maintenance
136
Prior to Inspection and Maintenance
136
List of Periodic Inspection and Maintenance
136
Check after Inspection and Maintenance
136
Adjusting the Leak Sensor Sensitivity
137
Adjustment Procedure
137
Corrective Action When Leakage Occurs
140
Exterior Cleaning
141
Technical Information
143
Installation
144
Installation Site
144
Suitable Sites and Preparation
144
Required Installation Space
145
Installation
146
Stacking Brackets
146
Power Supply Connection
147
Connection to Power Outlet
148
Grounding
148
Prior to Plumbing
149
Types of Tubings and Connectors
149
Cutting Tubings
149
Connecting Tubings
150
Protective Plugs
152
Plumbing
154
Using the Plumbing Inlets/Outlets
154
Connecting Leakage Drain Tubing
155
Column Bracket Installation
156
Positioning the Column Brackets
156
Installing Latches
156
Manual Injector Installation
157
Flow Line Plumbing
159
Manual Injector Plumbing
159
Plumbing between Pump Unit and Manual Injector
161
Plumbing between Manual Injector and Column
162
Plumbing between Column and Detector
163
Installation and Plumbing of Mixer (Option)
164
Preparation of Mixer
164
Mounting the Mixer on the Instrument
165
Mixer Plumbing (in Low-Pressure Gradient System)
166
Mixer Plumbing (in High-Pressure Gradient System)
167
Wiring
169
Connectors
169
Connecting the Optical Cable
170
Connection to System Controller
171
Installation of Ambient Temperature Sensor Accessory
172
Installation of Auto Column Switching Valve
173
High-Pressure Flow Line Switching Valve (FCV-12AH)
173
Connection to Chromatopac
174
Column Management Device (CMD)
175
Specifications
177
Maintenance Parts
178
Replacement Parts
178
Introduction to HPLC System
179
Example of a Simple (Isocratic) System
179
Function of Components
179
Example of Autosampler System (1)
180
Function of Components
180
Advertisement
Advertisement
Related Products
Shimadzu CTO-40C CL
Shimadzu CTO-20AC
Shimadzu CBM-40 CL
Shimadzu CBM-20A
Shimadzu CBM-20Alite
Shimadzu Categories
Laboratory Equipment
Measuring Instruments
Scales
Security Sensors
Controller
More Shimadzu Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL