Sign In
Upload
Manuals
Brands
Riello Manuals
Burner
RDB 3.2 BT 50/70
Riello RDB 3.2 BT 50/70 Manuals
Manuals and User Guides for Riello RDB 3.2 BT 50/70. We have
1
Riello RDB 3.2 BT 50/70 manual available for free PDF download: Installation, Use And Maintenance Instructions
Riello RDB 3.2 BT 50/70 Installation, Use And Maintenance Instructions (36 pages)
Kerosene burner
Brand:
Riello
| Category:
Burner
| Size: 1.15 MB
Table of Contents
Table of Contents
3
1 Declaration
5
2 Information and General Warnings
6
Information about the Instruction Manual
6
Introduction
6
General Dangers
6
Other Symbols
6
Delivery of the System and the Instruction Manual
7
Guarantee and Responsibility
7
Guidance for the Use of Biofuel Blends up to 30
8
Information and General Instructions
8
Product Disclaimer Statement
8
3 Safety and Prevention
9
Introduction
9
Safety Warnings
9
Basic Safety Rules
9
Personnel Training
10
4 Technical Description of the Burner
11
Models Available
11
Technical Data
11
Burner Description
11
Burner Equipment
12
Burner Dimensions
12
5 Installation
13
Notes on Safety for the Installation
13
Handling
13
Preliminary Checks
13
Installer/Servicer Notes for the Use of Gas Oil with Bio Blends up to 30% Where Gas Oil Use Is Permitted by the Appliance
14
Manufacturer
14
Working Position
14
Boiler Fixing
15
Burner Assembly
16
6 Hydraulic Systems
17
Fuel Supply
17
Pump
17
One Pipe System
18
Priming Pump
18
Two Pipe System
19
Priming Pump
19
7 Electrical System
20
Notes on Safety for the Electrical Wiring
20
Control Box
20
Example of an Electrical System Without Heater
21
8 Start-Up, Calibration and Operation of the Burner
22
Notes on Safety for the First Start-Up
22
Combustion Adjustment
22
Nozzles Installation
22
Nozzles Recommended
22
Pump Pressure
22
Maintenance Position
23
Air Damper Adjustment
23
Electrodes Setting
23
Combustion Head Setting
24
Operating Programme Without Heater
25
Table of Timings
26
Operations Status Indication
26
Faults Diagnosis - Lockouts
26
Fuel Pre-Heating Function (for Burners Equipped with Heater)
27
Shut-Down Test
27
Flame Detection
27
Intermittent Operation
27
Recycle and Limit of Repetitions
27
Presence of an Extraneous Light or Parasite Flame
27
Pre and Post Spark Ignition
27
10Reset Protection and Remote Reset
27
11Reset Push-Button Anomaly
27
12External Lockout Indicator
28
13Frequency Main Supply Anomaly
28
14Internal Voltage Anomaly
28
15Checking the Fan Motor
28
16Checking the Electronic Circuit Controlling the Oil Valve
28
17Eeprom Check
28
Automatic Pre-Heating Deactivation (for Burners Equipped with Heater)
28
Programming Menu
29
Shut-Down Test
29
Light Diagnosis
29
Intermittent Operation
30
Display of the Last Lockout that Occurred
30
Lockout Types
30
9 Maintenance
31
Notes on Safety for the Maintenance
31
Maintenance Programme
31
Maintenance Frequency
31
Checking and Cleaning
31
Safety Components
32
10 Faults / Solutions
33
Advertisement
Advertisement
Related Products
Riello RDB 3.2 BT 58/70
Riello bag 50
Riello Gulliver BS4
Riello Gulliver BS4D
Riello Gulliver BG1
Riello Gulliver BS3/M
Riello Gulliver BG7D
Riello BAG 130
Riello BGK2
Riello Gulliver BS3/M TXL
Riello Categories
Burner
Boiler
Indoor Fireplace
UPS
Air Conditioner
More Riello Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL