Sign In
Upload
Manuals
Brands
RenewAire Manuals
Fan
LE10XIN
RenewAire LE10XIN Manuals
Manuals and User Guides for RenewAire LE10XIN. We have
1
RenewAire LE10XIN manual available for free PDF download: Installation, Operation & Maintenance Manual
RenewAire LE10XIN Installation, Operation & Maintenance Manual (44 pages)
ENERGY RECOVERY VENTILATOR
Brand:
RenewAire
| Category:
Fan
| Size: 6 MB
Table of Contents
Important Safety Information
2
Unit Information
3
Table of Contents
4
Configuration Code for Le10Xin Models
6
Le10Xinh Submittal Specifications
7
Le10Xinh Dimensions
8
Le10Xinv Submittal Specifications
9
Le10Xinv Dimensions
10
LE10XINH Alternate Duct Configuration
11
Le10Xinv
12
Overview
11
Description
11
Factory Assembly of Modules
11
Models
11
Le10Xinh
11
LE10XINV Standard Duct Configuration
12
LE10XINV Alternate Duct Configuration
12
Component Description
13
Cabinet Construction
13
Cabinet Paint
13
Fan Motors
13
Fan Speed Control
13
Dampers
13
Enthalpic Core
13
Filters
13
Filter Monitors
13
Controls
14
Integrated Microprocessor Controls
14
Renewaire Microprocessor Controller Expansion Board
14
Premium Microprocessor Controls Installed
14
Variable Frequency Drive
15
Optional Control Accessories
15
Carbon Dioxide Control
15
Digital Time Clock
15
Carbon Dioxide Sensor, Room/Wall Mount
15
Time Clock, Panel Mount
15
Vfds Mounted Inside ERV
15
Time Clock, Exterior Enclosure
15
Carbon Dioxide Sensor, Duct Mount
15
VFD Keypads Found in E-Box
15
Indoor Air Quality Sensor (IAQ)
16
Motion Occupancy Control
16
Smoke Detector
16
IAQ Sensor, Room/Wall Mount
16
Ceiling Mount Occupancy Sensor
16
IAQ Sensor, Duct Mount
16
Wall Mount Occupancy Sensor
16
Unit Weights
17
Le10Xinh Corner Weights
17
Le10Xinv Corner Weights
17
Shipping / Receiving / Handling
18
Unit Weights / Dimensions
18
Unit Dimensions and Weight
18
Shipping Dimensions and Weight
18
Receiving
18
Rigging
18
Handling and Storage
18
Unit Placement
19
Sound Attenuation Outside the Building
19
Placement Cautions
19
Service Clearances
19
Double-Flange Duct Connection
20
Electrical Connections
21
Factory-Recommended Electric Service Entry
21
Installation
20
Assembly of Modules
20
Duct Connections
20
Indoor Sound Attenuation
20
E-Box Main Disconnect Switch
21
E-Box with Knockouts on Bottom
21
E-Box Low Voltage Terminal Strip
21
Wiring Schematics
22
Single Phase Wiring Schematic
22
Three Phase Wiring Schematic
23
Control Connections
24
VAC Power Supply Transformer
24
Motor Protection
25
Units Equipped with Motor Starters
25
Units with Variable Frequency Drives (Vfds)
26
External Control Connections
26
Single 2-Wire Control, Unpowered
26
Control Contractor Information
24
Vac Class II Power Supply
24
Dry Contactors and Overload Relays
26
Single 2 - Wire Control, Separate Power
27
Control Sending 24 VAC "ON" Signal
27
External Control Using ERV Power Supply
27
Control with 2 Non-Powered Relay Contacts
27
VAC from External Source
27
External Control Using ERV 24 VAC
27
Control with 2 Non-Powered Relay Contacts
28
Control with 2 "ON" Signals, External Power
28
Sequence of Operation
28
Pre Start-Up
30
Verify Voltages
30
Verify Transformer Wiring
30
Inspect Filters
30
Inspect Foam Gasketing
30
Inspect Motor Vibration Isolators
30
Inspect Belts and Verify Sheave Alignment
30
Inspect Fan
30
Inspect and Clean the Interior
30
Inspect Ductwork Connections
30
Start-Up
31
Verify Correct Fan Rotation Direction
31
Basic Operational Check
31
Motor Starter Units
31
VFD Units
31
Adjust Motor Sheaves
32
Clean Filter Pressure Drop Table (In. W.g.)
32
Electric Motor Maintenance
33
Belt Tension
33
Sheave Condition
33
Motor Cleanliness
33
Motor Lubrication
33
Maintenance
32
Maintenance 24 Hrs. after Start-Up
32
Maintenance 30 Days after Start-Up
32
Maintenance Schedule
32
Filters
32
Fan Belt Tensioning
33
Pillow Blocks
35
Fan Pillow Block
35
Enthalpic Core Maintenance
36
Removal of Enthalpic Cores
36
Reinstallation of Enthalpic Cores
36
End View of Core Support Assembly
36
Service Parts
37
LE10XINH and LE10XINV Service Parts
37
Fan and Motor Sled
38
Plenum Divider Panels
38
Risk of Core Damage
39
Filter Replacement Practices
39
Maintenance Reference
38
Plenum Dividers
38
Fan / Motor Removal
38
Vibration Isolator Adjustment
38
Filter Extractor Hook
39
Typical Spring-Type Vibration Isolator
39
Filter Spacers
39
Door Latch Adjustment
40
Measuring Airflow
40
Air Flow Test Port Location
40
Sheave Adjustment
41
Table of Sheave Adjustments
41
Two-Belt Adjustable Sheave (Typ)
41
Maintenance Records
42
Advertisement
Advertisement
Related Products
RenewAire LE10XRT
RenewAire LE10XRTH
RenewAire LE8XIN Series
RenewAire LE-8X*INH Series
RenewAire LE-8X*INV Series
RenewAire LE8XRT Series
RenewAire LE8XRTV
RenewAire LE8XRTH
RenewAire LE8XRTR
RenewAire LE6XIN Series
RenewAire Categories
Fan
Air Conditioner
Heating System
Controller
Industrial Equipment
More RenewAire Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL