Sign In
Upload
Manuals
Brands
REMEHA Manuals
Boiler
Gas 220 Ace 300
REMEHA Gas 220 Ace 300 Manuals
Manuals and User Guides for REMEHA Gas 220 Ace 300. We have
4
REMEHA Gas 220 Ace 300 manuals available for free PDF download: Installation And User Manual, Installation, User And Service Manual, Service Manual
REMEHA Gas 220 Ace 300 Installation And User Manual (100 pages)
High-efficiency floor-standing gas boiler
Brand:
REMEHA
| Category:
Boiler
| Size: 5 MB
Table of Contents
Dear Customer
2
Table of Contents
3
Safety
6
General Safety Instructions
6
For the Installer
6
For the End User
6
Recommendations
7
Liabilities
8
Manufacturer's Liability
8
Installer's Liability
8
User's Liability
8
About this Manual
8
General
8
Additional Documentation
8
Symbols Used in the Manual
9
Description of the Product
9
General Description
9
Main Components
10
Introduction to the E-Smart Controls Platform
10
Standard Delivery
11
Accessories and Options
11
Preparation of Installation
12
Installation Regulations
12
Choice of the Location
12
Location of the Boiler
12
Transport
13
Unpacking & Initial Preparation
13
Requirements for Water Connections
14
Requirements for the Central Heating Connections
14
Requirements for the Condensate Drain
14
Flushing the System
14
Requirements for the Gas Connection
14
Requirements on the Flue Gas Discharge System
15
Classification
15
Material
17
Dimensions of Flue Gas Outlet Pipe
18
Length of the Flue and Air Supply Pipes
18
Room-Ventilated Model (B 23P )
18
Room-Sealed Model (C 13 , C 33 , C 63 , C 93 )
19
Connection in Different Pressure Areas (C 53 )
20
Reduction Table
20
Additional Guidelines
20
Requirements for the Electrical Connections
21
Water Quality and Water Treatment
21
Installation Examples
21
How to Use the Installation Examples
21
How to Find the Desired Installation Example
23
Symbols Used
25
Installation Example H-01-01-02-01-00-02-01
27
Installation Example H-03-05-13-13-13-00-00
29
Installation Example H-03-08-02-01-00-02-01
31
Installation Example H-18-00-02-01-05-02-01
33
Installation Example H-21-04-02-02-00-00-00
35
Installation
37
Positioning the Boiler
37
Hydraulic Connections
38
Connecting the Heating Circuit
38
Connecting the Condensate Drain Pipe
38
Gas Connection
39
Connecting the Flue Gas Outlet
39
Connecting the Air Supply
39
Electrical Connections
40
Control Unit
40
Assembly of the Control Panel
40
Installation of the Connection Box
41
The CB-01 Connection PCB
42
Connecting the System Pump
42
Connecting a PWM System Pump
42
Blocking Input
44
Release Input
44
The SCB-10 Expansion PCB
44
Connecting a Mixing Valve
45
Connecting the Pump with a Protection Thermostat
46
Connecting a Pc/Laptop
48
Before Commissioning
48
Checklist before Commissioning
48
Filling the System
48
Filling the Condensate Trap
48
Gas Circuit
49
Control Panel Description
49
Control Panel Components
49
Description of the Home Screen
50
Description of the Main Menu
50
Description of the Icons in the Display
50
Commissioning
52
Commissioning Procedure
52
Gas Settings
52
Factory Setting
52
Adjusting to a Different Gas Type
52
Checking and Setting the Gas/Air Ratio
54
Checking/Setting Values for O 2 /CO 2 at Low Load
56
Final Instructions
58
Settings
59
Introduction to Parameter Codes
59
Searching the Parameters, Counters and Signals
59
List of Parameters
60
CU-Gh06C Control Unit Parameters
60
Maintenance
64
Maintenance Regulations
64
Maintenance Message
65
Opening the Boiler
65
Disposal and Recycling
65
10 Troubleshooting
66
Error Codes
66
Display of Error Codes
66
Warning
67
Blocking
69
Locking Codes
77
Error History
80
Reading out and Clearing the Error History
80
11 User Instructions
81
Start-Up
81
Accessing the User Level Menus
81
Home Screen
81
Activating Holiday Programs for All Zones
82
Heating Circuit Configuration
82
Changing the Heating Temperature of a Zone
83
Definition of Zone
83
Changing the Name and Symbol of a Zone
83
Changing the Operating Mode of a Zone
84
Time Program to Control the Zone Temperature
84
Creating a Timer Program
84
Definition of Activity
85
Activating a Timer Program
86
Changing the Heating Activity Temperatures
86
Changing the Room Temperature Temporarily
87
Changing the Domestic Hot Water Temperature
87
Domestic Hot Water Configuration
87
Changing the Domestic Hot Water Operating Mode
87
Time Program to Control the DHW Temperature
88
Activating a DHW Timer Program
88
Changing the Comfort and Reduced Hot Water Temperature
89
Increasing the Domestic Hot Water Temperature Temporarily
89
Switching the Central Heating on or off
89
Switching the Summer Mode on or off
90
11.10 Changing the Operating Mode
90
11.11 Changing the Control Panel Settings
90
11.12 Reading the Installer's Name and Phone Number
91
11.13 Shut-Down
91
11.14 Frost Protection
91
11.15 Cleaning the Casing
92
12 Technical Specifications
92
Homologations
92
Certifications
92
BREEAM Compliance
92
Unit Categories
92
Directives
92
Factory Test
92
Electrical Diagram
93
Dimensions and Connections
94
Technical Data
95
13 Appendix
97
Erp Information
97
Product Fiche
97
EC Declaration of Conformity
97
Advertisement
REMEHA Gas 220 Ace 300 Installation, User And Service Manual (92 pages)
High-efficiency floor-standing gas boiler, HMI S-control
Brand:
REMEHA
| Category:
Boiler
| Size: 9 MB
Table of Contents
Table of Contents
3
1 Safety
6
General Safety Instructions
6
Recommendations
8
Specific Safety Instructions
10
Additional Guidelines
10
Liabilities
10
Manufacturer's Liability
10
Installer's Liability
10
User's Liability
11
2 About this Manual
12
General
12
Additional Documentation
12
Symbols Used in the Manual
12
3 Technical Specifications
13
Homologations
13
Certifications
13
Unit Categories
13
Factory Test
13
Technical Data
13
Dimensions and Connections
16
Electrical Diagram
17
4 Description of the Product
18
Operating Principle
18
Gas/Air Regulation
18
Combustion
18
Control System
18
Control
18
Regulating the Water Temperature
19
Protection against Shortage of Water
19
Water Flow
19
Hydraulic Pressure Sensor
19
Air Pressure Differential Switch
19
Circulating Pump
19
Calorifier Connection
20
Main Components
20
Control Panel Description
21
What each Key Means
21
Meaning of the Symbols on the Display
21
Browsing in the Menus
22
Standard Delivery
23
Accessories and Options
23
5 Before Installation
24
Installation Regulations
24
Choice of the Location
24
Data Plate
24
Location of the Boiler
24
Transport
25
Unpacking & Initial Preparation
26
6 Installation
27
General
27
Preparation
27
Positioning the Boiler
27
Hydraulic Connections
27
Rinsing the System
27
Connecting the Heating Circuit
28
Connecting the Condensate Drain Pipe
29
Gas Connection
29
Air Supply/Flue Gas Outlet Connections
30
Classification
30
Material
32
Dimensions of Flue Gas Outlet Pipe
33
Length of the Air and Flue Gas Pipes
33
Additional Guidelines
35
Connecting the Flue Gas Outlet
36
Connecting the Air Supply
36
Specific Air and Flue Gas Applications
37
Electrical Connections
37
Recommendations
37
Control Unit
37
Assembly of the Control Panel
38
Installation of the Connection Box
39
Connection Options for the Standard PCB
40
Filling the Installation
43
Water Treatment
43
Filling the Siphon
43
Filling the System
44
7 Commissioning
45
Checklist before Commissioning
45
Preparing the Boiler for Commissioning
45
Gas Circuit
45
Hydraulic Circuit
45
Electrical Connections
45
Commissioning Procedure
45
Gas Settings
46
Adjusting to a Different Gas Type
46
Checking/Setting Combustion
47
Final Instructions
50
8 Operation
51
Use of the Control Panel
51
Shutdown
51
Frost Protection
51
9 Settings
52
List of Parameters
52
Parameters - FSB-WHB-HE-150-300
52
Changing the Parameters
55
Configuring the Installation Parameters
55
Reading out Measured Values
56
Reading out Counters
56
Reading out Signals and Software Versions
57
Counters - FSB-WHB-HE-150-300
58
Signals - FSB-WHB-HE-150-300
58
Status and Sub-Status - FSB-WHB-HE-150-300
59
10 Maintenance
62
General
62
Maintenance Message
62
Resetting the Service Messages
62
Starting a New Service Interval
63
Standard Inspection and Maintenance Operations
63
Checking the Water Pressure
63
Checking the Water Quality
63
Checking the Ionisation Current
63
Check the Flue Gas Outlet/Air Supply Connections
64
Checking the Combustion
64
Checking the PS Air Pressure Differential Switch
64
Checking the VPS Gas Leakage Control
66
Checking the Minimum Gas Pressure Switch GPS
68
Checking the Burner and Cleaning the Heat Exchanger
69
10.3.10 Clean the Condensate Collector
70
10.3.11 Cleaning the Siphon
70
Specific Maintenance Work
70
Replacing the Ionisation/Ignition Electrode
71
Checking the Non-Return Valve
71
Reassembling the Boiler
72
Disposal
73
Removal/Recycling
73
11 Troubleshooting
74
Error Codes
74
Warning - FSB-WHB-HE-150-300
74
Blocking - FSB-WHB-HE-150-300
75
Lock-Out - FSB-WHB-HE-150-300
77
Error Memory
80
12 Removal/Recycling
81
13 Spare Parts
82
General
82
Parts
83
14 Appendix
85
Erp Information
85
Product Fiche
85
EC Declaration of Conformity
85
Checklist for Commissioning
86
Checklist for Annual Maintenance
87
REMEHA Gas 220 Ace 300 Service Manual (60 pages)
High-efficiency floor-standing
Brand:
REMEHA
| Category:
Boiler
| Size: 7 MB
Table of Contents
Dear Customer
2
Table of Contents
3
About this Manual
5
Additional Documentation
5
Symbols Used in the Manual
5
Description of the Product
5
General Description
5
Operating Principle
6
Gas/Air Regulation
6
Combustion
6
Control System
6
Control
6
Regulating the Water Temperature
6
Protection against Shortage of Water
7
Water Flow
7
Hydraulic Pressure Sensor
7
Air Pressure Differential Switch
7
Circulating Pump
7
Calorifier Connection
8
Main Components
8
Introduction to the E-Smart Controls Platform
8
Use of the Control Panel
10
Control Panel Components
10
Description of the Home Screen
10
Description of the Main Menu
10
Description of the Icons in the Display
11
Installer Instructions
12
Accessing the User Level Menus
12
Accessing the Installer Level
12
Commissioning the Appliance
13
Chimney Sweep Menu
13
Saving the Commissioning Settings
14
Configuring the Installation at Installer Level
15
Changing the Control Panel Settings
15
Setting the Installer Details
16
Setting the Parameters
16
Setting the Heating Curve
16
Increasing the Domestic Hot Water Temperature Temporarily
17
Maintaining the Installation
17
Viewing the Service Notification
17
Reading out Measured Values
17
Viewing Production and Software Information
18
Manual Deaeration
18
Resetting or Restoring Settings
19
Resetting the Configuration Numbers CN1 and CN2
19
Carrying out an Auto Detect
19
Restoring the Commissioning Settings
19
Resetting to Factory Settings
20
Installation Examples
20
The SCB-01 Expansion PCB
20
Settings
20
Introduction to Parameter Codes
20
Searching the Parameters, Counters and Signals
21
List of Parameters
21
CU-Gh06C Control Unit Parameters
21
SCB-01 Expansion PCB Parameters
25
List of Measured Values
26
CU-Gh06C Control Unit Counters
26
SCB-01 Expansion PCB Counters
28
CU-Gh06C Control Unit Signals
28
SCB-01 Expansion PCB Signals
31
Status and Sub-Status
32
Maintenance
34
Maintenance Regulations
34
Maintenance Message
34
Standard Inspection and Maintenance Operations
34
Checking the Water Pressure
35
Checking the Water Quality
35
Checking the Ionisation Current
35
Check the Flue Gas Outlet/Air Supply Connections
35
Checking the Combustion
35
Checking/Setting Values for O 2 /CO 2 at Full Load
36
Checking/Setting Values for O 2 /CO 2 at Low Load
38
Checking the Air Pressure Differential Switch
40
Checking the Minimum Gas Pressure Switch GPS
41
Checking the Burner and Cleaning the Heat Exchanger
42
Cleaning the Condensate Collector
42
Cleaning the Condensate Trap
43
Specific Maintenance Work
43
Replacing the Ionisation/Ignition Electrode
44
Checking the Non-Return Valve
44
Finalising Work
45
Troubleshooting
45
Error Codes
45
Display of Error Codes
45
Warning
46
Blocking
47
Locking Codes
49
Error History
52
Reading out and Clearing the Error History
52
Technical Specifications
53
Electrical Diagram
53
10 Spare Parts
54
General
54
Parts
55
Advertisement
REMEHA Gas 220 Ace 300 Service Manual (64 pages)
High-efficiency floor-standing gas boiler
Brand:
REMEHA
| Category:
Boiler
| Size: 7 MB
Table of Contents
Table of Contents
3
1 About this Manual
5
Additional Documentation
5
Symbols Used in the Manual
5
2 Description of the Product
5
General Description
5
Operating Principle
6
Gas/Air Regulation
6
Combustion
6
Control System
6
Control
6
Regulating the Water Temperature
6
Protection against Shortage of Water
7
Water Flow
7
Hydraulic Pressure Sensor
7
Air Pressure Differential Switch
7
Circulating Pump
7
Calorifier Connection
8
Main Components
8
Introduction to the E-Smart Controls Platform
8
3 Use of the Control Panel
10
What each Key Means
10
Browsing in the Menus
10
Meaning of the Symbols on the Display
11
4 Installer Instructions
12
Changing User Parameters
12
Changing Installer Parameters
13
Adjusting Advanced Parameters
14
Commissioning the Installation
15
Chimney Sweep Mode (Forced Full Load or Low Load)
15
Configuring the Installation
15
Connected Control Pcbs
15
Maintaining the Installation
15
Resetting the Maintenance Message
15
Reading out Measured Values
16
Activating the Manual Mode Menu
18
Resetting or Restoring Settings
18
Carrying out an Auto-Detect
18
Restoring to Factory Settings
19
5 Installation Examples
20
The SCB-01 Expansion PCB
20
6 Settings
20
Introduction to Parameter Codes
20
List of Parameters
21
HMI S-Control Control Panel Parameters
21
CU-Gh06C Control Unit Parameters
21
SCB-01 Expansion PCB Parameters
24
List of Measured Values
25
CU-Gh06C Control Unit Counters
25
SCB-01 Expansion PCB Counters
26
CU-Gh06C Control Unit Signals
27
SCB-01 Expansion PCB Signals
30
Status and Sub-Status
30
7 Maintenance
32
Maintenance Regulations
32
Maintenance Message
32
Standard Inspection and Maintenance Operations
33
Checking the Water Pressure
33
Checking the Water Quality
33
Checking the Ionisation Current
33
Check the Flue Gas Outlet/Air Supply Connections
33
Checking the Combustion
33
Checking the Air Pressure Differential Switch
38
Checking the Gas Leakage Control (VPS)
40
Checking the Minimum Gas Pressure Switch GPS
42
Checking the Burner and Cleaning the Heat Exchanger
43
Cleaning the Condensate Collector
43
Cleaning the Condensate Trap
44
Specific Maintenance Work
44
Replacing the Ionisation/Ignition Electrode
45
Checking the Non-Return Valve
45
Finalising Work
46
8 Troubleshooting
47
Error Codes
47
Display of Error Codes
47
Warning
47
Blocking
48
Locking Codes
51
Error History
54
Reading out the Error Memory
54
Clearing the Error Memory
55
9 Technical Specifications
56
Electrical Diagram
56
10 Spare Parts
57
General
57
Parts
58
Advertisement
Related Products
REMEHA Gas 220 Ace 220
REMEHA Gas 220 Ace 160
REMEHA Gas 220 Ace 250
REMEHA Gas 220 Ace
REMEHA Gas 220 Ace 200
Remeha 24c
REMEHA Avanta 24v
REMEHA Gas 210 ECO
REMEHA Calenta 25s
REMEHA Gas 210 Ace 120
REMEHA Categories
Boiler
Thermostat
Heat Pump
Water Heater
Controller
More REMEHA Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL