Sign In
Upload
Manuals
Brands
Q CELLS Manuals
Inverter
Q.VOLT G2 HYB-5kW.1.1
Q CELLS Q.VOLT G2 HYB-5kW.1.1 Manuals
Manuals and User Guides for Q CELLS Q.VOLT G2 HYB-5kW.1.1. We have
1
Q CELLS Q.VOLT G2 HYB-5kW.1.1 manual available for free PDF download: Installation Manual
Q CELLS Q.VOLT G2 HYB-5kW.1.1 Installation Manual (120 pages)
Brand:
Q CELLS
| Category:
Inverter
| Size: 29 MB
Table of Contents
Table of Contents
2
Table of Tables
5
1 Information in this Manual
8
About this Manual
8
Target Group
8
Additional Information
8
Symbols Used
8
[ Table 1-1 : Symbol Description 1 ]
9
[ Table 1-2 : Symbol Description 2 ]
10
[ Table 1-3 : Symbol Description (Battery) ]
10
2 Safety
11
Intended Use
11
MEN Link
11
Network System Connection Diagram
12
Safety Precautions
13
Product Overview
14
INVERTER Product Overview
14
[ Table 2-1 : Part Description of INVERTER ]
14
Battery Product Overview
15
[ Table 2-2 : Part Description of Battery Pack ]
15
Basic Specifications (Germany)
16
[ Table 2-3 : Basic Specifications (Germany) ]
16
Basic Specifications (Australia & New Zealand)
17
[ Table 2-4 : Basic Specifications (Australia & New Zealand)]
17
Grounding the PV INVERTER
18
3 Package Removal and Inspection
19
Package Removal
19
Removing the INVERTER Enclosure Package
19
Removing the Battery Enclosure Package
20
Checking Components on the Packing List
21
[ Table 3-1 : Component Description of INVERTER ]
21
[ Table 3-2 : Component Description of Battery Pack ]
22
[ Table 3-3 : Component Description of Option ]
22
Checking for Damage in Delivery
23
Identifying Q.HOME+ ESS HYB G2
23
Figure 3-8 : Battery Name Plate ]
24
4 Installation
25
Selection of Installation Location
25
Dimensions
26
Ambient Conditions and Temperatures
26
Environmental Checks
26
Position (Location Selection)
27
Mounting Instructions
28
[ Table 4-1 : Screw Specification ]
28
Figure 4-5 : Bracket on the Wall in Step 3 ]
29
Figure 4-7 : Bracket on the Wall in Step 5 ]
30
Stand - Mounting Instructions
31
Figure 4-9 : Stand List]
31
5 Electrical Connections
32
Electrical System Connection
32
The Overview of Electrical Connection
33
Power Line Specification
33
Cable Gland Specification
33
Overall Drawing of the Q.HOME+ ESS HYB G2
33
[ Table 5-1 : Power Line Specification ]
33
[ Table 5-2 : Cable Gland Specification ]
33
[ Table 5-3 : Component Description of INVERTER ]
33
[ Table 5-4 : Component Description of Battery Pack ]
35
Opening the Front Case Cover
36
[ Table 5-5 : Front Case Open Process ]
36
Battery Connections
37
Figure 5-10 : BMS Communication Wire Connection ]
39
Closing the Front Case Cover
40
Figure 5-13 : Front Cover Assembly Process 1 ]
40
Circuit Breaker
41
AC Circuit Breaker and DC Disconnect Switch
41
RCD (Residual Current Device) Leakage Circuit Breaker
41
[ Table 5-6 : Circuit Breaker and DC Disconnection Switch ]
41
[ Table 5-7 : RCD Leakage Circuit Breaker Description ]
41
An Installation Method of Energy Meter Electrical Connection
42
A Connecting Method of the DC Line from the PV
43
Figure 5-18 : Wire Connection and Disconnection ]
44
Connection Method between Grid and Load
45
Grid Connection Method
45
Load Connection Method
45
Battery Connection Method
45
Feature and Size of Cable
46
[ Table 5-8 : Insulation Strip Lengths ]
46
Figure 5-22 : AC Cable Gland ]
47
A Connecting Method of DRM Connection
48
[ Table 5-9 : Drms Supported by the INVERTER ]
48
6 Communication Connection
50
Internet Connection
50
Components
50
Connection Block Diagram
50
Connection Method
50
The Communication Terminal
51
[ Table 6-1 : Description of Short Bar Location ]
51
Energy Meter Connection
52
Interface
52
Connection Energy Meter
52
[ Table 6-2 : Recommended Meter List ]
52
Recommended Energy Meter List
53
[ Table 6-3 : Recommended Meter List ]
53
Homepage
54
Service Terms
54
Membership
54
Membership Withdrawal
54
Log-In
54
Password Initialization
55
Types of Service Offered
55
Figure 6-11 : Backup Mode Monitoring Page ]
56
Figure 6-13 : Forecast Page ]
57
Mobile Service
58
7 Entering Initial Installation Information
59
Information Input Administrator
59
System Information Input Stage
59
PC Direct Connection and Local Setting Value
59
PC Direct Connection Flow
59
LAN Cable Connection between PC and System
59
SIM (System Install Manager) Connection
59
Figure 7-1 : Setting Laptop IP ]
60
Figure 7-3 : Initial Setup Page ]
61
Sim(System Install Manager) Battery Installing
62
Battery Installation Process with HMI
64
Entering Setting Value
69
Web
70
Web Page Connection
70
Figure 7-5 : Installer in Page ]
71
Figure 7-6 : Product Information Entry Screen in Step 1 ]
72
Figure 7-8 : Product Setup Information Details Entry in Step 3 ]
73
Figure 7-10 : Installation Completion Screen ]
74
8 Operating Test
75
LED Indications
75
Starting the System
75
Loading Screen & Update Screen
75
[ Table 8-1 : LED Indications ]
75
Home Screen Configuration Information
76
[ Table 8-2 : Screen Configuration Information ]
76
Turning off the System
77
Descriptions of Operation Mode
78
Status Description
78
Operation Sequence
78
Standby Mode
78
[ Table 8-3 : Status Description ]
78
[ Table 8-4 : ELA Mode ]
78
PV-Auto Mode
79
PV-Only Mode
80
Battery-Discharge Mode
81
Stand-Alone (Back-Up) Mode
81
Grid Charge Mode
82
Event Check Mode
82
Information Display
83
PV Information Display
83
[ Table 8-5 : PV Information Display Description ]
83
Grid Information Display
84
[ Table 8-6 : Grid Information Display Description ]
84
[ Table 8-7 : Load Information Display Description ]
84
Load Information Display
85
[ Table 8-8 : Battery Information Display Description ]
85
Battery Information Display
86
System Information Display
87
[ Table 8-9 : System Information Display Description ]
87
Error Information Display
88
[ Table 8-10 : Error Information Display Description ]
88
9 Problem Confirmation
89
General Events
89
INVERTER General Events (Protection)
89
[ Table 9-1 : INVERTER General Events Warning List ]
99
Battery General Events (Protection)
100
[ Table 9-2 : Battery Operation General Events List ]
106
System General Events (Protection)
107
[ Table 9-3 : System General Events Protection List ]
107
10 Maintenance
108
Cleaning the Cover
108
Checking and Exchanging Various Components
108
Fuse Check
108
Input / Output Terminal Check
108
DC Link Check
108
Battery Maintenance
109
Checking Battery Problem
109
Battery Exchange Procedure
109
The List of Replaceable Parts
110
Li-Ion Battery Pack
110
PV Connector
110
[ Table 10-1 : Replaceable Parts List ]
110
11 Technical Specifications
112
[ Table 11-1 : Technical Specifications (Germany) ]
112
[ Table 11-2 : Technical Specifications (Australia & New Zealand) ]
114
[ Table 11-3 : Maximum Charge Current Limit ]
115
[ Table 11-4 : Maximum Discharge Current Limit ]
116
12 Disassembly
117
Packaging
118
13 Contact
119
Advertisement
Advertisement
Related Products
Q CELLS Q.VOLT G2 HYB-4.6kW.1.1
Q CELLS Q.SAVE G2 4kWh B1.1.1
Q CELLS Q.VOLT-G2 HYB-5kW.1.1
Q CELLS Q.VOLT-G2 HYB-4.6kW.1.1
Q CELLS Q.PEAK DUO G10 370Wp
Q CELLS B.LINE G4
Q CELLS DUO-G9 Series
Q CELLS Q.HOME CORE A5
Q CELLS Q.HOME PLUS ESS-G1 3.6
Q CELLS Q.HOME+ ESS HYB G2
Q CELLS Categories
Solar panel
Inverter
Control Unit
Racks & Stands
More Q CELLS Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL