Sign In
Upload
Manuals
Brands
ProMinent Manuals
Industrial Equipment
Bello Zon CDKa 150
ProMinent Bello Zon CDKa 150 Manuals
Manuals and User Guides for ProMinent Bello Zon CDKa 150. We have
1
ProMinent Bello Zon CDKa 150 manual available for free PDF download: Operating Instructions Manual
ProMinent Bello Zon CDKa 150 Operating Instructions Manual (58 pages)
Brand:
ProMinent
| Category:
Industrial Equipment
| Size: 4 MB
Table of Contents
Table of Contents
3
General Instruction for Use
6
Important General Information
7
A Instructions for Regulation Use
7
B Obligations of the User
7
C Instructions for Introducing Operators to Chlorine Dioxide System
7
D Information on General Safety
8
E Emissions
10
F Terms and Abbreviations Used
10
1 Description of Chlorine Dioxide System, Chemical Principle and Functional Mode of System
11
Detailed Description of System
12
Identification Code
12
Operating Code "Aktiv
13
Construction: Description of the System and Its Construction Groups
15
Technical Specifications
20
Technical Features of the System
20
Cdk
21
Performance Data
22
Reactor Specifications
23
Weight
23
Climate and Environment
24
Specifications of Electrical Components
24
Temperature
24
Electrical Wiring Diagram for Bello Zon
25
Control CDK, Inputs and Outputs (Customer Mounting)
27
Electrical Configuration of Distribution Box CDK
27
Chemical Components
28
Information Sign "Sodium Chlorite
28
Prohibitive Sign "No Fire
28
Shock and Moisture Protection (IP)
28
Supplementary Kit
28
Warning Sign "Chlorine Dioxide System Access
28
Warning Sign "Toxic Substances
28
Warning Signs
28
Operating Elements and Indicators, Tap Positions
29
Control CDK/CDV, Operating Elements and Indicators
29
Electrical Operating Elements and Indicators
29
Ball Valve
30
Ball Valve Cdka, Position "Calibrate
31
Ball Valve Cdka, Position "Venting
31
Safety Measures
32
Ball Valve Cdka, Position "Operating
32
Bypass Monitor
32
Flow Monitors
32
Exhaust
33
Level Switch
33
Chlorine Dioxide System Accessories
33
Bypass Pump with Wall Bracket
33
Safety Trays 70 L
33
Premixing (Static Mixer)
34
Protective Filter
34
Set for Determining Chlorine Dioxide
34
Ventilation Valves
34
Intake Lances, Intake Fitings
35
Part Number Table for Spare Parts and Spare Parts Set
35
Spare Part Sets
35
Heating Systems for Chemical Lines
36
Metering Systems
36
Spare Parts Lists
36
2 Commissioning
37
Information on Current Regulations
37
Initial Operation of the System Type Cdkaxaxxxxxxxx (with Calibration Vessels)
37
Airing and Starting
37
Leak Test
37
Setting Flow Monitors
38
Setting Parameters and Calibration
38
Safety Checks
39
Commissioning System Type Cdkaxbxxxxxxxx (W/O Calibrating Vessels)
40
3 Shutting down Chlorine Dioxide System
40
Placing out of Operation for a Short Period of Time
40
Placing out of Operation for a Longer Period of Time
40
Placing out of Operation and Frost-Proof Storage
41
4 Replacing Acid and Chlorite Component Tanks
41
5 Operation of Chlorine Dioxide System
42
Setting Ball Valves
42
Setting the Metering Rate
42
Menu Sequence "Internal Control
42
Menu "Internal Control
42
Menu Sequence "Flow Dependent Metering
43
Menu Sequence "Control Variable Dependent Metering
44
Menu Sequence "Bypass Options
45
Accuracy of Metering Rate
45
Menu "Bypass Options
45
Determining Chlorine Dioxide Concentration
46
Chlorine Dioxide Metering Rate
46
6 Operating Errors, Help, Troubleshooting
46
Consequences of Operating Errors
46
Incorrect Setting of Flow Monitor (Ring Initiators)
46
Incorrect Setting of Metering Pumps
46
Incorrect Setting of Air Bleed Taps (Acid, Chlorite and Water)
47
Incorrect Use of Control
47
Malfunctions
47
Error Messages at Control
47
Malfunctioning of Metering Pumps
47
7 Inspection and Maintenance
49
Safety Requirements, Safety Information
49
Maintenance of Overall System
49
Maintenance and Service for the Bello Zon Reactor; Removing and Detoxifying Reactor Content
49
Maintenance of Metering Pumps
50
Maintenance Intervals, Lifetime of System
50
8 Mounting and Dismantling Chlorine Dioxide Systems
51
Mechanical and Hydraulic Installation of System
51
Hydraulic Connections
51
Wall Mounting of CDK Support Bracket
51
Metering Pump Intake Lances or Intake Fittings for Acid and Chlorite
52
Dilution Water Tank and Water Metering Pump
53
Reactor Space Venting
53
Electrical Installation of the System
53
Control
53
Connections at Distributor Box
54
Dismantling the Chlorine Dioxide System
54
Disposal of Used Parts
54
List of Illustration
55
9 List of Illustrations
55
EC Declaration of Conformity
56
Advertisement
Advertisement
Related Products
ProMinent Bello Zon CDKa 420
ProMinent Bello Zon CDKa 760
ProMinent Bello Zon CDKa 1500
ProMinent Bello Zon CDKa 6000
ProMinent Bello Zon CDKa 10000
ProMinent ProMaqua Bello Zon CDEa 45
ProMinent ProMaqua Bello Zon CDEa 80
ProMinent ProMaqua Bello Zon CDEa 140
ProMinent CHLORINSITU V
ProMinent CHLORINSITU IIa XL
ProMinent Categories
Water Pump
Controller
Measuring Instruments
Industrial Equipment
Accessories
More ProMinent Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL