Sign In
Upload
Manuals
Brands
Nilar Manuals
Portable Generator
Ferroamp Home Box
Nilar Ferroamp Home Box Generator Manuals
Manuals and User Guides for Nilar Ferroamp Home Box Generator. We have
1
Nilar Ferroamp Home Box Generator manual available for free PDF download: Instruction Manual
Nilar Ferroamp Home Box Instruction Manual (44 pages)
Brand:
Nilar
| Category:
Portable Generator
| Size: 3.31 MB
Table of Contents
Table of Contents
5
1 Safety Information
10
Safety Markings in this Instruction
10
General Warnings and Cautions
10
2 Technical Support and Warranty
11
Figure 1: Indication of Serial Number Sticker on the Nilar Home Box
11
3 Environment
12
Compliance
12
Cabinet
12
Battery Management System (BMS)
12
Battery Pack
12
Integrated Monitoring Unit (IMU)
12
4 Function Description
13
Figure 2: Nilar Hydride® Battery Pack 144VDC (12 Modules)
13
Figure 3: Nilar EC Home Box 6Kwh - Ferroamp
13
Figure 4: General Schematic Overview
14
General Schematic Overview
14
System Specification
14
Table 1: Specification for Nilar Home Box
14
Battery Pack Specification and Build-Up
15
Battery String
15
Figure 5: Home Box Unit Measurements (Excl. Mounting Brackets)
15
Figure 6: Measurement Illustration of 144V Battery Pack with Length Incl. IMU (Excl. Insulation Tray)
15
Measurements
15
Figure 7: 144VDC Battery Pack with IMU on Front
16
Figure 8: Disconnection of Cable Connectors
16
Integrated Monitoring Unit (IMU)
16
Connections IMU
17
Figure 9: Overview of IMU with Cover Lid Removed
17
Table 2: Description of Visual Signals
17
Figure 10: Indicated Connection Points of IMU '1' Indicates Pin 1 of Connection
18
Figure 11: Orientation of Battery Pack
19
5 Transportation, Lifting and Storage
20
Transportation
20
Moving and Lifting
21
Figure 12: Battery Pack Incl. Lifting Straps
21
Figure 13: Cabinet with Indicated Lifting Points
21
Storage
22
Table 3: Relation between Temperature and the Recommended Maximum Storage Time at 75% Soc Initial Capacity
22
6 Installation
23
General Conditions on Site
24
Scope of Supply
24
Figure 14: Scope of Supply
24
Table 4: Denomination Table
24
Placement
25
Adjustment
25
Figure 15: Nilar Home Box with Indicated Minimum Distances to Neighboring Objects
25
Figure 16: Indication of Support Legs
25
Attachment
26
Dismantling of Cabinet Prior to Installation
26
Figure 17: Mounting Brackets for Wall Attachment
26
Figure 18: Removal of Cover Lid
26
Figure 19: Dismantling of Corner Tops
27
Figure 20: before and after Removal of Side Plate with Indicated Suspension
27
Figure 21: before and after Removal of Front Plate with Indicated Suspension
27
Connection of Energyhub System Power Supply
28
Figure 22: before and after Removal of Top Plate
28
Figure 23: before and after Removal of BMS Cover
28
Figure 25: Location of the Connection Terminals for Ferroamp Energyhub Power Cable
29
Figure 26: Dedicated Terminal for Positive (+) Wire
29
Figure 27: Dedicated Terminal for Negative (-) Wire
29
Figure 28: Dedicated Terminal for PE Wire
29
Communication
30
Figure 29: General Overview of the Communication Loop
30
Figure 30: Location of RJ45 Port for Internet Connection
30
Preparation of Connections Prior to Installation
31
6.10 Placement of Battery Packs
31
Figure 31: Installed Battery String Sorted According to Labeling
32
Figure 32: Placement of Insulation Tray in Home Box
32
Figure 33: before and after Placement of Battery Pack Inside Insulation Tray
32
Figure 34: Attached and Installed Battery Packs with Insulation Trays
32
6.11 Connection of Battery Packs
33
Figure 35: before and after IMU Cover Lid Removal
33
Figure 36: Installation of Current Sensor Cable on IMU of Battery Pack 'D
33
Figure 37: Installation of Ingoing Canopen Communication Cable into CAN2 Socket on IMU
33
Figure 38: Installation of Fan Connection on IMU
34
Figure 39: Installation of 24VDC Power Supply Connection on IMU
34
Figure 40: Installation of Ambient Temperature Sensor Connection on IMU of Battery Pack 'A
34
Figure 41: Detail View of Cable Entry on Cover Lid of IMU
35
Figure 42: Installed Negative (-) Cable (IMU Connections Are Not Displayed)
35
Figure 43: Installed Interpack Cable between Battery Pack 'A' and 'B' (IMU Connections Are Not Displayed)
36
Figure 44: Installed Interpack Cable on Positive (+) Terminal for Battery Pack 'B' (IMU Connections Are Not Displayed)
36
Figure 45: Installed Interpack Cable on Negative (-) Terminal for Battery Pack 'C' (IMU Connections Are Not Displayed)
37
Figure 46: Installed Interpack Cable between Battery Pack 'C' and 'D' (IMU Connections Are Not Displayed)
37
Figure 47: Current Sensor Displayed with Correct Installation Direction
38
Figure 48: Installed Positive (+) Cable Including Current Sensor (Remaining IMU Connections Are Not Displayed)
38
6.12 Assembly of Cabinet
39
Figure 49: Location of Fuses Within the BMS
39
7 Operation
40
Checklist for Operation
40
8 Maintenance
41
Protective Measures During Maintenance
41
Inspection and Monitoring
41
9 Decommissioning
42
Temporarily Decommissioning
42
Permanent Decommissioning
42
Figure 50: WEEE Symbol for Separate Disposal
42
10 Troubleshooting
43
Advertisement
Advertisement
Related Products
Nilar Categories
Battery Pack
Camera Accessories
Portable Generator
Audio & Video Accessories
More Nilar Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL