Sign In
Upload
Manuals
Brands
Manitowoc Manuals
Construction Equipment
91501 Series
Manitowoc 91501 Series Manuals
Manuals and User Guides for Manitowoc 91501 Series. We have
1
Manitowoc 91501 Series manual available for free PDF download: Operator's Manual
Manitowoc 91501 Series Operator's Manual (254 pages)
Brand:
Manitowoc
| Category:
Construction Equipment
| Size: 16.6 MB
Table of Contents
Table of Contents
5
Section 1
13
Crane Data
13
Crane Weights
13
Outline Dimensions
13
Crane Identification
13
Change of Ownership Registration
13
Manitowoc Dealer
13
Crane Orientation
13
Identification and Location of Components
14
English and Metric Conversions
16
Direct Conversion
16
Inverse Conversion
16
Section 2
19
Continuous Innovation
21
Nameplates and Decals
21
Safety Messages
21
General
21
Safety Alert Symbol
21
Signal Words
21
Symbol Identification
21
Safety and Information Signs
23
Maintaining Signs
23
Ordering Signs
23
Crane Access Points
25
General
25
Getting on or off Crane
25
Personal Fall-Protection
25
Operator Manual/Capacity Chart Storage
26
General
26
Storing Manuals
26
Safe Operating Practices
27
General
27
Read Operator Manual
27
Operator Qualifications
27
Operator Conduct
27
Handling Load
29
Size of Load
29
Attaching Load
29
Lifting/Moving Load
30
Multiple Load Line Operation
31
Signals
32
Holding Load
32
Safety Devices
33
Operational Aids
33
Category 1 Operational Aids
33
Category 2 Operational Aids
34
Assembling, Disassembling, or Operating Crane Near Electric Power and Transmission Lines
35
Electrocution Hazard
35
Set-Up and Operation
35
Electrocution Hazard Devices
36
Electrical Contact
36
Refueling
37
Fire Extinguishers
37
Accidents
37
Safe Maintenance
37
Maintenance Instructions
37
Safe Maintenance Practices
37
Environmental Protection
39
Boom Disassembly Safety
41
General
41
Location
41
Pin Removal
41
Disassembly Precaution
41
Personnel Handling Policy
42
Pedestal/Barge Mounted Cranes
43
Pedestal Mounted Crane
44
Barge Mounted Crane
44
Definition
44
Examples
44
Capacity Charts for Barge Mounted Crane
45
Shock Loading Caused by Barge Dynamics
45
Operation on Barge
45
Barge Mount Definitions
46
Inspection of Barge-Mounted Crane
46
Transporting Crane on Barge
46
Section 3
47
Standard Hand Signals for Controlling Crane Operations
50
Symbols Used on Control Consoles
52
Operating Controls
56
Left Console
60
Right Console
62
Overhead Console
69
Foot Pedals
73
Seat Controls
74
Other Operating Aids and Controls
75
Boom Angle Indicator
75
Crane Capacity Beacon (Optional)
75
Crane Levels
75
Swing and Travel Alarm
75
Battery Disconnect Switch
76
Crane Cameras
78
Crane Camera Monitor
79
Remote Control
80
Carbody Controls
82
Operating Limits Identification
83
Cab Window Operation
87
Opening Windows for Ventilation
87
Exiting Cab in Emergency
87
Operating in Wind
87
Crawler Blocking
87
Preparing Crane for Operation
88
Startup Procedures
88
Operating Procedures
90
Boom Hoist Operation
90
Luffing Hoist Operation
92
Bypassing Limits in Luffing Jib Setup Mode
92
Resetting Luffing Jib Limits
93
Swing Operation
94
Load Drum Operation-Liftcrane Full Power
95
Load Drum Operation-Liftcrane Free Fall
96
Free Fall Drum Slip and Pedal Response
97
Load Drum Operation-Clamshell
98
Preparing for Clamshell Operation
98
Clamshell Operation in Full-Power
98
Travel Operation
99
Shutdown Procedure or Leaving the Crane Unattended
102
Cold Weather Operation
104
Crane Limitations
104
Wire Rope
104
Cold Weather Starting Aid
104
Cooling System
104
Batteries
104
Engine Oil, Gear Oil, and Hydraulic Oil
104
AC Power Supply
106
Turning AC Power on
106
Turning AC Power off
106
Work Lights
106
Cold Weather Heaters
108
Fuses and Circuit Breakers
110
Boom and Jib Assembly Drawings
115
Liftcrane Boom Butt Capacities
115
Crane Orientation
115
Accessing Parts
115
Assembly and Disassembly Notes
115
Assembly and Disassembly Area
116
Handling Components
116
Retaining Connecting Pins
116
Crane Weights and Shipping Data
116
Parts Storage
116
Parts Box
116
Position Light and Anemometer Option
117
Chain Lifting Sling
119
Shipping Configuration
120
Self-Erect Configuration
120
Self-Erect Controls
123
Pin and Connecting Hole Cleanliness
124
Hose and Cable Cleanliness
124
Connecting/Disconnecting Hydraulic Hoses and Electric Cables
124
Pre-Start Checks
124
Deploy the Crane Platforms as Necessary to Gain Access to Components
124
Engine
124
Gear Boxes
124
Hydraulic System
124
Operating Limits for Assembly and Disassembly
125
Crane Assembly
127
Prepare Trailer for Unloading
127
Deploy Crane Platforms
127
Prepare Cab
129
Raise Handrails
131
Start Engine
131
Configure RCL/RCI for Crane Setup
131
Deploy Carbody Jacks
133
Raise Gantry
135
Remove Trailer
136
Install Self-Erect Hook Block
136
Install Chain Lifting Sling
137
Install Crawlers - Preliminary Steps
139
Install First Crawler
139
Install Second Crawler
142
Deploy Crawler Steps
143
Store Carbody Jacks
143
Connect Crawler Hydraulic Hoses
145
Raise Handrails
145
Unload Trailers
149
Assemble Boom and Jib
151
Install Carbody Counterweight
151
Assemble Crane Counterweight
153
Enable Remote Control
155
Install Crane Counterweight
155
Install Crane Counterweight (Continued)
157
Block under Last Insert
161
Remove Self-Erect Hook Block
161
Connect Boom Butt to Boom
161
Connect Boom Straps to Equalizer
163
Close Boom
163
Disconnect Equalizer from Boom Butt
163
Configure RCL/RCI for Crane Operation
163
Connect Boom Butt to Boom Top Electric Cables
165
Install Boom Top Position Light and Wind Speed Indicator (Option)
167
Install Boom Top Camera (Option)
167
Install Boom Block-Up Limit Components
167
Install Jib Top Position Light and Wind Speed Indicator (Option)
169
Install Jib Top Camera (Option)
169
Connect Jib Extension Cable
169
Install Jib Block-Up Limit Components
169
Deactivating/Activating a Block-Up Limit Switch
171
Install Load Lines
173
Section 4
115
Boom and Jib Rigging - General
174
Rigging Drawings
174
Blocked Crawlers
174
Identifying Boom and Jib Components
174
Boom Handling with Equalizer
175
Handling Boom and Jib Sections
175
Boom #350 Assembly
177
Assemble Boom Inserts
177
Connect Boom Top/Cap to Inserts
177
Raise Boom Cap Wire Rope Guide
177
Connect Boom Straps
179
Install Intermediate Suspension Pendants
179
Install Upper Boom Point
179
Install Optional Tagline
180
Complete Boom/Crane Assembly
180
Jib #134 Assembly
183
Prepare Boom
183
Install Jib Package
183
Deploy Backstay Spreader
183
Install Jib Inserts
183
Install Jib Top
185
Install Jib Pendants
185
Prepare Backstay Pendants
185
Connect Backstay Pendants to Boom
187
Install the Jib Stop
189
Complete Jib Rigging
189
Raise Boom
190
Pre-Raising Checks
190
Boom Raising Procedure
190
Shipping Crane Components
191
Crane Disassembly
193
Prepare Crane
193
Lower Boom
193
Store Load Lines
193
Store Block-Up Limit Components
193
Remove Boom/Jib Point Electronics
193
Connect Equalizer to Boom Butt
195
Open Boom
197
Disconnect Boom Straps from Equalizer
199
Disconnect Boom Butt from Boom
199
Install Self-Erect Hook Block
201
Configure RCL/RCI for Crane Setup
201
Remove Blocking from under Last Insert
201
Install Chain Lifting Sling
201
Remove Crane Counterweight
203
Remove Crane Counterweight (Continued)
205
Disassemble Crane Counterweight
205
Store Handrails
205
Remove Carbody Counterweight
207
Disassemble Boom and Jib
209
Deploy Carbody Jacks
211
Store Crawler Steps
213
Disconnect Crawler Hydraulic Hoses
213
Remove First Crawler
213
Remove Second Crawler
215
Remove Chain Lifting Sling
217
Remove Self-Erect Hook Block
217
Install Trailer under Crane
219
Lower the Boom Butt and Gantry
219
Store Carbody Jacks
221
Secure Operator Cab
221
Lower Handrails
221
Store Crane Platforms
221
Boom #350 Disassembly
223
Jib #134 Disassembly
225
Lower Boom and Jib
225
Prepare Jib for Shipping
225
Store Jib Stop
225
Lower Jib Strut
227
Remove Jib Pendants
227
Remove Jib Top
229
Remove Jib Inserts
229
Install Jib Top on Jib Butt
229
Store Backstay Spreader and Pendants
229
Remove Jib Package
229
Wire Rope Installation
230
Wire Rope Specifications
230
Wire Rope Storage
230
Seizing and Cutting Wire Rope
230
Anchoring Wire Rope to Drum
230
Winding Wire Rope Onto Drum
232
Anchoring Wire Rope to Wedge Socket
235
Anchoring Wire Rope to Button Socket
237
Pad Eye Usage for Wire Rope Reeving
237
Breaking in Wire Rope
237
Load Line Reeving
239
Guide Sheaves and Drums
239
Dead End Location
239
Load Block Identification
240
Wire Rope Specifications
240
Load Block Reeving
240
Load Block Tieback
241
General
241
Specifications
241
Advertisement
Advertisement
Related Products
Manitowoc 999
Manitowoc NATIONAL CRANE 900A
Manitowoc NATIONAL CRANE 969A
Manitowoc NATIONAL CRANE 990A
Manitowoc NATIONAL CRANE 9103A
Manitowoc 999 1 Series
Manitowoc 999 2 Series
Manitowoc 999 3 Series
Manitowoc National Crane 900H
Manitowoc 12000-1
Manitowoc Categories
Construction Equipment
Ice Maker
Accessories
Commercial Food Equipment
Dispenser
More Manitowoc Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL