Sign In
Upload
Manuals
Brands
GESTRA Manuals
Measuring Instruments
SRL 6-60
User Manuals: GESTRA SRL 6-60 Measuring Instruments
Manuals and User Guides for GESTRA SRL 6-60 Measuring Instruments. We have
1
GESTRA SRL 6-60 Measuring Instruments manual available for free PDF download: Original Installation & Operating Manual
GESTRA SRL 6-60 Original Installation & Operating Manual (48 pages)
Monitoring Logic Unit
Brand:
GESTRA
| Category:
Measuring Instruments
| Size: 0 MB
Table of Contents
Table of Contents
2
Content of this Manual
4
Scope of Delivery/Product Package
4
How to Use this Manual
5
Illustrations and Symbols Used
5
Hazard Symbols in this Manual
5
Types of Warning
6
Specialist Terms/Abbreviations
7
Usage for the Intended Purpose
8
Overview of Possible Unit Combinations
8
Applicable Directives and Standards
9
Improper Use
9
Basic Safety Notes
10
Required Personnel Qualifications
10
Notes on Product Liability
10
Function
11
System Description - Intended Purpose
11
Functional Description of the SRL 6-60
13
Configuring and Operating the SRL 6-60
14
Technical Data
15
Factory Settings
16
Name Plate/Identification
17
Dimensions of Field Housing
18
Installation
19
Installation Steps
20
Interfaces and Cable Entry of the SRL 6-60
21
Electrical Connection Safety Notes
22
Connecting the Valve Limit Switches
22
Connecting External Pilot Lamps to the Relay Output Terminal
22
Wiring Diagram for the SRL-6-60 Monitoring Logic Unit
23
Connecting the CAN Bus System
24
Bus Line, Cable Length and Cross-Section
24
Example
24
Important Notes on Connecting the CAN Bus System
25
Pin Assignment of the CAN Bus Connector and Coupling for Non Pre-Wired Control Cables
25
Configuring the URS 60/ URS 61 Safety Control Units
26
Operation and Navigation
27
User Interface (Showing Interval as an Example)
27
Operation
27
Colour Coding of Input and Status Fields
28
Login with a Password
28
Start, Operation, Alarm and Test
29
The Home Screen after Switching on
29
Brief Description of the Interval Time
29
Brief Description of the Standby Time
30
Purge Time
30
Purging
31
Stop
32
Special Function
33
Testing the Purging Process to Check the Event Chain
34
Monitoring
35
What to Do if the Mains Power Fails/Returns
35
Settings
36
Opening the Main Menu
36
Setting the Date/Time
37
Setting the Baud Rate
38
Setting the Baud Rate on the WAGO CAN Coupler 750-347
38
Configuring the SRL 6-60 Monitoring Logic Unit
40
Opening the "Setup" Menu
40
Login with a Password
41
Setting the Safety Control Unit, Level Electrode and the Level Electrode Function
41
Setting the Interval and Standby Time
42
Ending Configuration
42
Viewing Messages
43
Display of All Events and System States
43
System Malfunctions
45
Common Faults During Use
45
What to Do in the Event of System Malfunctions
45
Check Installation and Function
45
Taking out of Service/Disassembly
46
Disposal
46
Returning Decontaminated Devices
46
EU Declaration of Conformity
47
Advertisement
Advertisement
Related Products
GESTRA SRL 6-50
GESTRA SRL 63-a
GESTRA SPECTORcontrol II
GESTRA Spector Compact Series
GESTRA SPECTORcontrol
GESTRA SPECTORcontrol Flow
GESTRA LRG 16-40
GESTRA LRG 16-41
GESTRA LRG 17-40
Gestra LRGT 16-1
GESTRA Categories
Switch
Controller
Control Unit
Measuring Instruments
Transmitter
More GESTRA Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL