Sign In
Upload
Manuals
Brands
Frick Manuals
Industrial Equipment
AcuAir
Frick AcuAir Manuals
Manuals and User Guides for Frick AcuAir. We have
1
Frick AcuAir manual available for free PDF download: Manual
Frick AcuAir Manual (58 pages)
Hygienic Air Units
Brand:
Frick
| Category:
Industrial Equipment
| Size: 3 MB
Table of Contents
Table of Contents
3
Introduction
4
Safety
4
Warranty
4
Preinstallation Requirements
6
Training & Safety Considerations
6
Preliminary Site Layout Considerations
6
Preliminary Field Piping Design Considerations
6
Installation
8
Receiving & Inspection
8
Storage
8
Support Structure Information
10
Section Reconnect Ship Loose Items
11
Installation Tools
11
General Split Unit Reassembly
12
Removable Lifting Lugs
12
Electrical Wiring/Piping
12
Roof Curb Assembly (Optional)
12
Roof Curb Installation
12
Performance Grade Connections
13
Reassembly Procedure for Split Unit Performance Series Only
13
Reconnection Attachment and Sealing Procedure
14
Insulation of the Base Reconnect Seam of an Acuair Performance Series Unit
15
Acuair Performance Series Roof Sealant Procedure
17
Food Grade and Sanitary Connections
18
Reconnect Installation Procedure
18
Acuair Food Grade or Sanitary Series Roof Reconnect Finish
19
Insulation of the Base Reconnect Seam of an Acuair Food Grade or Sanitary Series Unit
21
Foam Kit 15 Use Guidelines Acuair Unit Base Reconnect Insulation
22
Acuair Fresh Air Intake Plenum
23
Fan Hold-Down / Spring Isolator Setup
25
Condensate Drain Trap Sizing
26
Drain Pan Construction
26
Field Piping Requirements
26
Duct Connections
27
Weather Hood Connection Direct to the Acuair Fresh Air Opening
28
Filter Installation Table of Contents
30
Filter Latches
30
Acuair Single Filter Application (Non-Hepa)
31
Hepa Filter Application
33
Non-Hepa Filters in Hepa Frames
33
Installation of 4" Pleated Panel (Pre)Filters
34
Installation of SH Single Headered Filters
34
Installation of a RIGID DH Double-Headered Filter
34
Hepa Filters
36
Start-Up
37
Initial Start-Up
37
Blower, Motor, Drives
37
New Belt Run-In
37
Filters
37
Cooling Coils
37
Start-Up after Prolonged Shutdown
38
Maintenance
39
Daily Operation and Routine Maintenance
39
Coil Maintenance
39
Damper Maintenance
39
Filter Maintenance
40
Electrical Conduit Sealing Requirement
40
Sources of Water or Ice
40
Remedy
40
Temperature Sensor Calibration
40
Two Calibration Methods Are
40
Unit Cleaning and Sanitation
41
White Rust and Wet Storage Stain of Galvanized Steel
41
Fan Bearing Lubrication
42
Recommended Lubricant for Fan Bearings
42
Proper Interval and Quantity - See Tables 1, 2 & 3
42
Fan Segment-Fan Motor
42
Mounting Hardware and Adjustable Motor Base
42
Motor Condition (Visual)
42
Electrical Checks
42
Lubrication
43
Inspecting V-Belts and Sheaves
44
Tensioning V-Belts and Sheaves
44
Operating and Maintenance Instructions for Piezometer
46
Recommended Monthly Service
46
Maintenance Intervals
47
Recommended Maintenance Intervals
47
Spare Parts Recommendations
47
Troubleshooting
48
Acuair Factory Start-Up Assistance
49
Acuair Air Handler Prestart-Up Checklist
50
PRESTART-UP (for Site Records)
50
Appendix
52
Advertisement
Advertisement
Related Products
Frick AGHN
Frick AXGHN
Frick AGBF
Frick IDSC
Frick IDSC2
Frick LaZerWeld II
Frick LZWII-12M
Frick LZWII-2M
Frick LZWII-4B
Frick LZWII-4E
Frick Categories
Control Panel
Air Compressor
Industrial Equipment
Compressor
Air Conditioner
More Frick Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL