Sign In
Upload
Manuals
Brands
Elecsys Manuals
Measuring Instruments
WATCHDOG II MESH
Elecsys WATCHDOG II MESH Manuals
Manuals and User Guides for Elecsys WATCHDOG II MESH. We have
1
Elecsys WATCHDOG II MESH manual available for free PDF download: Installation And Operation Manual
Elecsys WATCHDOG II MESH Installation And Operation Manual (38 pages)
Wireless Remote Monitoring System
Brand:
Elecsys
| Category:
Measuring Instruments
| Size: 1 MB
Table of Contents
Table of Contents
2
Materials Supplied
4
General Introduction
5
Wireless Sensor Measurement Modules
5
Watchdog II Base Station Wired Sensor Inputs
5
Dry Contact Digital Inputs
5
Open Collector Digital Output
5
Pulse Counter / Accumulator Digital Input
6
Data Communications
6
Analog Input (0-5 VDC or 4 - 20 Ma)
6
Digital Cellular
6
Inmarsat Satellite Using Isatm2M Data Protocol
7
Modbus Based SCADA System Using a Modbus Data Radio
7
Base Station Power Options
8
Continuous (Always On) Power Options
8
115 / 230 Volts AC Line Power
8
Low Voltage AC Power: Rectifier Secondary Taps (12-25 Volts AC Recommended)
9
Low Voltage DC Power: TEG Power or Large Solar System (10-35 Volts DC)
9
Field Installation Instructions
9
Preparation Prior to Going to Field
9
Gather Proper Installation Materials & Tools
10
System Setup (DIP Switch Settings)
10
Configuring and Linking the Smart Node Channels
12
Link the Interruption Module (if Interruption Capability Is Included)
15
Field Installation Instructions
16
Step 1: Determine the Positive Terminal on the Current Shunt
16
Step 2: Turn off the Rectifier and Shut off the Circuit Breaker to the Rectifier
16
Step 3: Connect Power to the Interrupter Module
16
Step 4: Mount Satellite Modem (if Satellite Model was Ordered)
16
Step 5: Mount the Base Station
17
Step 6A: 115/230 VAC Wiring Option
18
Step 6B: Rectifier Secondary Tap Option (Low Voltage AC)
19
Step 6C: Low Voltage DC Power Option (+10 to 35 Volts DC)
19
Step 7: Wire External Inputs
19
Step 8: Install the 3-Channel Smart Node (P/N NTG-01- 0002-01)
20
Step 9: Install the "AC Probe" Rectifier Input Power Sensor
22
Step 10: Install the Interrupter Relay System
22
Step 11: Install the GPS Antenna
23
Step 12: Install the Interrupter II Mesh Module (NTG-01-0006- XX)
23
Step 13: Perform a PUSHBUTTON TEST to Verify Proper Operation
24
Using the Pipeline Watchdog Web Monitor
25
Log Onto the Elecsys Watchdogcp Web Monitor
25
Enter Site Data
25
Enter Data Labels and Descriptions
26
Setting Important Operational Parameters
26
Wakeup/Sampling Interval
27
Reporting Schedule
28
Alarm Notification Setup
28
Types of Alarm Notifications
29
Getting E-Mail Notifications
29
Getting Cell Phone SMS Text Messages
30
Watchdogcp Remote Monitoring System Component Specifications
31
Base Station (Powered) (NTG-01-1111-00 / 01)
31
Smart Node Voltage Measurement Range
31
Smart Node Current Measurement Range
31
Smart Node Pipe-To-Soil Measurement Range
31
Base Station Analog Input
32
4-20Ma Input
32
0-5V Input
32
Base Station Digital Output
32
Base Station Discrete Inputs
32
Base Station Accumulator
32
Technical Support
33
Products under Warranty
33
Products Not under Warranty
33
Elecsys Address and Contact Information
34
Warranty Policy
35
Appendix A - Miscellaneous Website Commands
36
Advertisement
Advertisement
Related Products
Elecsys Categories
Gateway
Measuring Instruments
Test Equipment
Data Loggers
More Elecsys Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL