Sign In
Upload
Manuals
Brands
CR Remeha Manuals
Boiler
Quinta Pro 115
CR Remeha Quinta Pro 115 Manuals
Manuals and User Guides for CR Remeha Quinta Pro 115. We have
1
CR Remeha Quinta Pro 115 manual available for free PDF download: Installation And Service Manual
CR Remeha Quinta Pro 115 Installation And Service Manual (92 pages)
Wall-hung gas condensing boilers
Brand:
CR Remeha
| Category:
Boiler
| Size: 3 MB
Table of Contents
Eg Declaration of Conformity
2
Table of Contents
3
Introduction
8
Symbols Used
8
Abbreviations
8
General
8
Manufacturer's Liability
8
Installer's Liability
9
User's Liability
9
Homologations
10
Certifications
10
Equipment Categories
10
Additional Directives
10
Factory Test
10
Safety Instructions and Recommendations
11
Safety Instructions
11
Recommendations
11
Technical Description
13
General Description
13
Main Parts
13
Operating Principle
13
Shunt Pump
13
System in Cascade
14
Calorifier Connection
14
Water Flow Rate
14
Technical Specifications
15
Installation
17
Regulations Governing Installation
17
Package List
17
Standard Delivery
17
Accessories
17
Choice of the Location
18
Data Plate
18
Location of the Boiler
19
Ventilation
19
Main Dimensions
20
Positioning the Boiler
21
Hydraulic Connections
22
Flushing the System
22
Connection of the Heating Circuit
22
Connecting the Expansion Vessel
23
Connecting the Condensate Discharge Pipe
23
Gas Connection
24
Connections for the Air and Exhaust Pipes
24
Classification
24
Outlets
25
Lengths of the Air/Flue Gas Pipes
26
Additional Directives
27
Connection of the Combustion Gas Exhaust Pipe
28
Electrical Connections
28
Control Unit
28
Recommendations
29
Standard Control PCB
30
Connecting the Pump
30
Connecting a Third Party Control Unit
32
Connecting the Outside Temperature Sensor
33
Connect Frost Protection
34
Connecting the Calorifier Sensor/Thermostat
35
Pc/Laptop Connection
35
Shutdown Input
35
Release Input
36
Optional Electrical Connections
36
Box for the Control Pcbs
36
Connection Options for the 0-10 V Control PCB (IF-01)
36
Connection Possibilities for the PCB (SCU- S02)
38
Connection Possibilities for the PCB (SCU- S03)
40
Connection Possibilities for the PCB (SCU- X01)
40
Connection Possibilities for the PCB (SCU- X02)
41
Connection Possibilities for the PCB (SCU- X03)
42
Connection Possibilities for the PCB (C-MIX)
43
4.10 Electrical Diagram
44
4.11 Filling the System
45
Water Treatment
45
Filling the Siphon
45
Filling the System
46
Commissioning
47
Control Panel
47
Functions of the Keys
47
Meaning of the Symbols on the Display
47
Check Points before Commissioning
48
Preparing the Boiler for Commissioning
48
Gas Circuit
48
Hydraulic Circuit
49
Electrical Connections
49
Commissioning the Boiler
49
Gas Settings
51
Adapting to Another Gas Type
51
Setting the Air/Gas Ratio (Full Load)
52
Setting the Air/Gas Ratio (Part Load)
53
Finalizing Work
54
Reading out Measured Values
54
Reading the Various Current Values
54
Readout from the Hour Counter and Percentage of Successful Starts
55
Status and Sub-Status
56
Changing the Settings
57
Parameter Descriptions
57
Modification of the User-Level Parameters
59
Modification of the Installer-Level Parameters
60
Setting the Maximum Heat Input for Central Heating Operation
60
Return to the Factory Settings
62
Carrying out an Auto-Detect
63
Setting the Manual Mode
63
Switching off the Boiler
64
Installation Shutdown
64
Antifreeze Protection
64
Checking and Maintenance
65
Maintenance Message
65
Preventive Maintenance with Automated Service Message
65
Resetting the Automatic Maintenance Message
66
Dealing with the Next Maintenance Message and Starting the New Maintenance Period
66
Standard Inspection and Maintenance Operations
67
Checking the Hydraulic Pressure
67
Checking the Ionization Current
67
Checking the Tightness of the Flue Gas Evacuation and Air Inlet Connections
67
Checking Combustion
68
Checking the Automatic Air Vent
69
Checking the Siphon
69
Checking the Burner and Cleaning the Heat Exchanger
70
Specific Maintenance Operations
71
Inspection of the Ignition Electrode
71
Replacing the Non-Return Valve
72
Assembling the Boiler
72
Troubleshooting
73
Error Codes
73
Shutdowns and Lock-Outs
76
Blockage
76
Blocking
76
Error Memory
78
Error Readout Memorised
79
Deletion of the Error Display
80
Spare Parts
81
General
81
10 Checklists
86
10.1 Checklist for Commissioning
86
10.2 Checklist for Periodic Inspection and Maintenance
87
Advertisement
Advertisement
Related Products
CR Remeha Quinta Pro 90
CR Remeha Quinta Pro 30
CR Remeha Quinta Pro 45
CR Remeha Quinta Pro 65
CR Remeha QUINTA ACE Series
CR Remeha Quinta Ace 30
CR Remeha Quinta Ace 45
CR Remeha Quinta Ace 55
CR Remeha Quinta Ace 65
CR Remeha Quinta Ace 90
CR Remeha Categories
Boiler
Thermostat
Inverter
More CR Remeha Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL