Table of Contents
Table of Contents
3
Introduction
6
Scope
7
Tasks
7
Preparation of Area (EAR2 & Technical Gallery)
8
20. Break Vacuum
9
Disconnect Filter Box and Permanent Magnet Vacuum Tubes
10
40. Remove Magnet
11
50. Remove Filter Box
12
Fit Cover Plate to Vacuum Chamber 1
13
Remove Rails and Aluminium Ventilation Sealing Plate
14
Remove Concrete Shielding Bricks
15
Remove Upper Bellow
16
100. Install Supporting Plate over Pit
17
110. Remove Connecting Pipe
18
120. Remove Vacuum Chamber Upper Parts
19
130. Remove Pillar Structure and Detector Assembly
20
140. Remove Cover, Lead, Vacuum Valve, Transition Flange, al Vacuum Chamber
21
150. Remove Borated Polyethylene Elements and B4C
22
160. Remove Collimator-2
23
170. Remove Steel Balls
24
180. Remove Big Collimator Vessel and Vacuum Chamber 4
25
190. Remove the Flange Support and the Sliding Pads
26
200. Remove Concrete Ring
27
210. Remove Support for Steel Sphere System
28
220. Prepare Area for Target #2 Removal (Items below the Gallery)
29
230. Remove Supporting Cover over Pit
30
240. Remove Inner Collimator from Vacuum Chamber
31
250. Remove Remaining Parts over Long Vacuum Chamber
33
251. Install Cover over Vacuum Chamber
34
252. Remove Steel Shielding from Around Vacuum Chamber
35
260. Remove Long Vacuum Chamber
36
270. Install Monorail above Shaft
38
280. Load Test Monorail Track
39
290. Remove Supporting Cover over Pit
40
300. Remove Support Frame for Vacuum Chamber 1
41
310. Remove Square Shielding
42
320. Remove Support for Square Shielding
43
330. Drain Upper Section of Pipes from the Cooling Station
44
331. Remove Round Shielding Block 4
45
332. Install the Solid Version of Round Shielding Block 4
46
335. Drill and Drain the Pipes at the Top
47
336. Remove Solid Version of Shielding Block 4
48
340. Remove Round Shielding Blocks 3 and 2
49
350. Remove Shielding Block 1
50
355. Install the Solid Version of Shielding Block 1
52
360. Remove Pipe Retaining Screws
53
370. Pull Pipes Away from Wall
54
380. Remove Bracket Top Plates
55
390. Fix Pipes out of the Way against Wall
56
400. Pump out Water from this Level
57
410. Remove Ladders and Equipment and Prepare for the Removal of the Block
58
420. Remove Solid Version of Round Shielding Block 1
59
430. Remove Centring Plate
60
440. Raise Target to Technical Gallery Whilst Pipes Are Cut
61
450. RP Measurements of the Target
63
460. Remove the Target from the Tech Gallery and Lower It through the Trapdoor into the Draining Tray
64
470. Drill Hole in Target to Drain Moderating Circuit
66
480. Drill Holes in Target to Drain Cooling Circuit
67
490. Lift the Target, Place It in the Tech Gallery
69
500. Lower the Target Inside the Shielding Box
70
510. Pull the Target out from below the Trap Door
71
520. Take the Shielding Box out of the Trolley, and into the PSI Container
72
530. Remove the PSI Container out of ISR8
74
540. Place Sections of Cut Pipe Inside Containers
75
550. Place the Solid Shielding Block 1 Back in the Pit
76
560. Cooling Pipes Removal. Disconnect the 4 Pipes
77
570. Disconnect the Lower End of the Pipes
78
580. Place Slings on the Moderating and Cooling Water Pipes to Support Them
79
590. Remove the Supports Attaching the Pipes to the Wall
80
600. Remove the Pipes Using the Monorail
81
610. Cut the Pipes and Place Them into Containers
82
620. Pipe Assembly Removal, Cooling Station Side
83
630. Pipe Assembly Removal, Pit Side
84
640. Pipe Assembly Removal, Extraction and Cutting
85
650. Technical Gallery Cleaning
86
660. Remove Dump Core Insert
87
670. Remove Cap Around Outer Beam Dump
88
680. Remove Outer Dump Blocks
89
690. Remove Inner Beam Dump Blocks
90
700. Remove Dump Concrete Ring (+ Vacuum Chamber)
91
710. Remove Support Plate
92
List of Annexes
93
N_Tof EAR2 Beam Line Installation Procedure (EDMS: 1302710)
93
Ntof Target 2 Removal - Schedule (EDMS: 2066754)
93
Advertisement
Advertisement
Related Products
CERN Categories
Measuring Instruments
Computer Hardware
More CERN Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL