Sign In
Upload
Manuals
Brands
BlueBox Manuals
Chiller
Zeta Rev
BlueBox Zeta Rev Air-cooled Chiller Manuals
Manuals and User Guides for BlueBox Zeta Rev Air-cooled Chiller. We have
1
BlueBox Zeta Rev Air-cooled Chiller manual available for free PDF download: Installation, Use And Maintenance Manual
BlueBox Zeta Rev Installation, Use And Maintenance Manual (64 pages)
Brand:
BlueBox
| Category:
Chiller
| Size: 1 MB
Table of Contents
Table of Contents
3
1 Introduction
6
Conformity
6
Description
6
Symbols
6
Labels
7
2 Safety
8
General Safety Precautions
8
Discharge of the Safety Valves
9
Emergency Stop
9
Basic Rules
10
Water Flow Rate at the Heat Exchangers
11
Water Composition
11
Minimum Water Content in the System
12
Installing the Flow Switch
13
Unit Operating in Heat Pump Mode
13
Operation with Water to the Evaporator at Low Temperature
14
Operation with Water to the Condenser at Low Temperature
14
Condensate Drain (Only for Heat Pump Units)
15
Hydraulic Connection to the Heat Recuperator (DC Option)
15
Hydraulic Connection to the Desuperheater (DS Option)
16
Noise
17
Residual Risks
17
Safety Information on the Refrigerant Fluid
18
Hazards and Health Consequences
18
3 Receiving the Product and Storage
19
Reception
19
Transport
19
Handling
20
Storage
22
4 Product Description
23
Intended Use
23
Unintended Use
23
Control and Safety Devices
24
Principles of Operation
24
Structure
24
Specifications
24
Control Panels
25
Parametric Control
25
Programmable Control
27
Wiring Diagram
27
5 Installation
28
Dimensions and Weight
28
Installation Site
28
Installation
29
External Positioning
29
Noise Attenuation
31
Minimum Distances
31
Hydraulic Connections
32
Electrical Connections
34
Refrigeration Connections
35
Piping Implementation
35
LE Version: Unit Installed at a Higher Level than the Remote Exchanger
36
LE Version: Unit Installed at a Lower Level than the Remote Exchanger
37
LE/HP Version: Unit Installed at a Higher Level than the Remote Exchanger
37
LE/HP Version: Unit Installed at a Lower Level than the Remote Exchanger
38
Expansion Valve
38
Vacuum and Refrigerant Charge
39
Topping up with Oil
40
6 Commissioning
41
Preliminary Operations
41
Checking the Pre-Charge of the Expansion Vessel
42
Checking the Volume of the Expansion Vessel
42
Preliminary Instructions for Units with Remote Exchanger
43
First Starting
44
Hydraulic Tests
44
Functional Tests
44
Adjustment of the Inverter of the User-Side Pump
45
Adjustment for Constant Water Flow Rate "Flowzer VP
45
Adjustment for Constant Water Pressure "Flowzer VD
47
Calibration of Safety Components
48
Checks During Operation
49
Alarms and Malfunctions
50
Temporary Stop
51
Stop for Long Periods of Time
51
7 Maintenance
52
Adjustments
52
External Cleaning
53
Cleaning Traditional Finned Coils in Cu/Al
53
Cleaning the Microchannel Coils
54
Cleaning E-Coated Microchannel Coils
54
Internal Cleaning
56
Cleaning the Unit
56
Cleaning the Plate Heat Exchangers
57
Periodic Checks
58
Unscheduled Maintenance
59
Special Work
59
8 Decommissioning
60
Advertisement
Advertisement
Related Products
BlueBox Omega Sky Xi
BlueBox Omega Sky Xi HPW
BlueBox Omega Sky Xi OH
BlueBox Categories
Rfid Systems
Chiller
Amplifier
Air Conditioner
Engine
More BlueBox Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL