Sign In
Upload
Manuals
Brands
Böhnke + Partner Manuals
Control Systems
bp308
Böhnke + Partner bp308 Manuals
Manuals and User Guides for Böhnke + Partner bp308. We have
1
Böhnke + Partner bp308 manual available for free PDF download: Installation Manual
Böhnke + Partner bp308 Installation Manual (154 pages)
Brand:
Böhnke + Partner
| Category:
Control Systems
| Size: 10 MB
Table of Contents
Table of Contents
3
1 General Information
7
Many Thanks
7
Purpose
8
Documentation
8
2 Safety Information
9
Qualified Personnel
9
Safety Instructions Concerning Control Units
9
Assembling and Operating Requirements
11
3 Product Certifications
12
General Description
12
EC Type Test Certificate BPL 02 with SMZ
13
EC Certification Bp308
16
(95/16E/G): 01/208/5A/1103/1644Ae5
16
Declaration of Conformity with EC Directive
16
(95/16/Eg)
16
4 Standards
18
EMC-Directives
18
5 Control System »Bp308
20
Description of the Product and Its Functions
20
Summary of the Functions of Bp308
21
Decentralised Lift Control
24
The Group System
24
Priority Calls
25
Group Display in Winmos®300
25
Components of the Bp308
26
Variants of Bp308
28
Brief Description Bp308
28
Top Shot
28
Left Side View
29
Bottom Shot
29
Right Side View
30
Operator Panel and LCD of the Bp308
30
Standard View
30
Lift Status Bar
31
Operator Panel
31
Safety Circuit Status Bar
31
Service Menu
31
Starting the Service Menu
32
Setup Menu
32
Starting the Setup Menu
32
Call Menu
33
Info Menu
33
Terminal-Mode
34
Monitor Program Lpcmon
34
Starting the Monitoring Program
34
Program and Parameter Memory
35
Exchange
35
General Information
35
Software Update
36
Control System Bp308 and Frequency Inverter Together in One Cabinet
37
Easy Service - Thanks to Clear Layout Assembly
38
Control Cabinet with Bp308 Unit
38
Standard Features
40
Optional Features
42
Uninterruptible Power Supply (UPS)
42
6 Installation and Commissioning
44
Conditions for Storage and Operation
44
Preparation
45
Installation of the Controller System Bp308
46
Installation of the Control Cabinet
46
Assembly of the Car Terminal Box
46
Assembly of the Absolute Encoder
46
Fixation Kits for Absolute Encoder
47
Assembly in the Shaft
47
Assembly on the Car
48
Assembly of the Magnet Switches
49
7 Electrical Installation
50
Preparation
50
Interference Suppression and Hints
51
Connection of Shielded Cables
55
Designation of Circuit Diagrams
55
Sample Circuit Diagram of a Rope Traction Lift
58
Sample Circuit Diagram of a Hydraulically Operated Lift
59
Electrical Installation
60
Bus Connection
60
Electrical Bus Medium
60
Colours of the Cables
61
Topology of the Network
61
Control Unit of an Lift out of a Group
62
Example of a Correct Topology
62
Group of Two Lifts in One Line
63
Group of Two Lifts in Three Lines
64
Group of Two Lifts in Two Lines
65
Pin Assignment of D-Sub Plug Connector with 9 Pins
66
Pin Assignment of the RJ45 Socket Connector
66
Pin Assignments
66
Node Ids of the CAN Components
67
Pin-Assignment of the Open-Style-Connector
67
Travelling Cable to the Car Top Box
68
Selection of the Frequency Inverter
69
Selection by CAN Bus
69
DCP-Connection to the Inverter
69
Pin Assignment of DCP Plug Connector
69
Wiring in Parallel with RVM-01
70
Installation of the Absolute Encoder
72
Interconnection of the Group
72
Data Lines to the Remote Diagnostics
73
System
73
Analogue Telephone Line
73
Ethernet
73
Isdn
73
Lon
74
Installation of the Emergency Call System
74
8 Commissioning Instructions
75
Preparation
76
Voltage-Test Module STM-02
76
Prior to the First Switch-On
76
Technical Tips Concerning the Control Unit
77
Checks before Starting the Control Unit
84
Switching the Mains Voltage
86
Checking the Bus Lines
87
Checking the Bus Termination
88
Checking the CAN Parameters
88
Checking the DCP Connection
88
First Travel with Emergency Controls
89
First Travel with Inspection Controls
90
Course of a Regulated Two Speed Travel (Summary)
92
Disconnection Points for the High Travelling Speed (V3)
93
Course of a Direct Travel with DCP (Summary)
94
Commissioning of the Floor Selector System
95
Installation of the Deceleration Switches
95
Basic Settings
96
Read-In Travel with Absolute Encoder
97
Travel Speeds
98
Impulse Diagrams of Absolute Encoder, Without Short Distance Landing
101
Impulse Diagrams of Absolute Encoder with Short Distance Landing
102
First Travel with Normal Operation Controls
103
Optimising the Travelling Behaviour
104
Commissioning the Emergency Call System
104
Commissioning the Data Remote Diagnostics
104
Commissioning of a Modem
105
Commissioning of a Network Access
105
Completing the Commissioning
106
9 Troubleshooting
107
Monitoring Routines
107
Malfunction Information
109
Reporting of Malfunctions
109
Malfunction Stack
110
Malfunction List
110
Messages
111
Repair Work
112
10 Maintenance
113
Appendix
114
A Menu Navigation Bp308
114
B Service Menu Quick Reference
116
C Setup Menu Quick Reference
133
Advertisement
Advertisement
Related Products
Böhnke + Partner Schmersal bp408
Böhnke + Partner Categories
Control Systems
More Böhnke + Partner Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL