Sign In
Upload
Manuals
Brands
Asco Manuals
Portable Generator
Froment 8800 Series
Asco Froment 8800 Series Manuals
Manuals and User Guides for Asco Froment 8800 Series. We have
1
Asco Froment 8800 Series manual available for free PDF download: User Manual
Asco Froment 8800 Series User Manual (114 pages)
High Voltage Load Banks
Brand:
Asco
| Category:
Portable Generator
| Size: 4 MB
Table of Contents
Table of Contents
4
Introduction
8
An Important Note on Safety
9
Chapter One - Introducing Froment Load Banks
11
Why Is Power Supply Testing Required
12
How Can a Generator be Tested Effectively
12
The Load Bank
12
How Do Load Banks Work
13
Introducing Froment Load Banks
13
Froment Load Bank Control Options
15
User Control Interfaces
15
Non-Unity Power Factor Testing
18
When Is Non Unity Power Factor Testing Required
19
Multiple Generator Testing
19
What Equipment Is Required
19
Movable Load Banks
20
Load Bank Applications
22
Generating Set Testing
22
Testing UPS Systems and Batteries
23
Site Load Correction
23
Using Multiple Load Banks
25
Introducing Froment 8800 SERIES Load Banks
26
8800 Series
27
ERIES Load Bank Specifications
27
Chapter Two - Load Bank Installation and Setup
29
Using a Froment Load Bank Safely
30
Transporting Froment 8800 SERIES Load Banks
32
Lifting by Crane or Hoist
32
Transport
32
Storage
32
Packaging
32
Installing Froment Load Banks
33
Location
33
Avoiding Hot Air Re-Circulation
34
Electrical Installation
35
Voltage and Frequency Ratings
36
Connecting the External Supply
36
Anti-Condensation Heaters and Lighting Supply
36
Connecting the Supply-On-Test
37
Supply-On-Test General Points
38
Control System Connections
39
High Voltage (HV) Instrumentation Mode
39
Low Voltage (LV) Instrumentation Mode
39
System Monitor Control
40
Optional Remote Connections
40
Commissioning
41
Chapter Three Load Bank Operation
43
Before Operating the Load Bank
44
Safety Warning
44
Controlling the Load Bank
45
The Control Room
46
The External Power Inlet Compartment
47
Main Control Panel
48
System Monitor
50
Operating the Ring Main Unit (RMU)
50
Status Indicator Lamp Operation
51
Fault Indicators
51
Emergency Shutdown Procedures
53
Load Function Test
54
Chapter Four - Hand-Held Reference Guide
56
The Sigma Hand-Held
56
Firmware Updates
57
Connecting the Hand-Held to the Load Bank
58
The Hand-Held Keypad
59
The Hand-Held Menu Display System
60
Using the Sigma Hand-Held
62
Hand-Held Quick Start
63
Using the Settings Pages
64
The Options Page
69
The Test Pages
72
Manual Test Mode
77
Chapter Five Maintenance & Troubleshooting
85
Safety Warning
86
Routine Maintenance Procedures
87
Ring Main Unit (RMU) Maintenance
88
Housing Exterior
88
Housing Interior
88
Leakage of SF6 Gas
89
Service Life
89
Transformer Maintenance
89
Fault Finding
89
Sigma 2 Load Bank Status Display
90
Sigma 2 Normal Operation
91
Froment Load Bank System Monitor
95
Startup Screen
95
The Meters Screen
96
Status Screen
100
Appendices
103
8800 - Installation Diagrams
104
Transformer Commissioning
107
Transformer Maintenance Schedule
110
Certificate of Conformity
111
Electromagnetic Compatibility
112
Advertisement
Advertisement
Related Products
Asco 8000 SERIES
Asco 8300
Asco 8400
Asco Categories
Control Unit
Switch
Surge Protector
Protection Device
Controller
More Asco Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL