Sign In
Upload
Manuals
Brands
ABB Manuals
Automobile Accessories
Terra 104 UL
ABB Terra 104 UL Manuals
Manuals and User Guides for ABB Terra 104 UL. We have
1
ABB Terra 104 UL manual available for free PDF download: Operation And Installation Manual
ABB Terra 104 UL Operation And Installation Manual (92 pages)
Brand:
ABB
| Category:
Automobile Accessories
| Size: 2.88 MB
Table of Contents
Table of Contents
3
About this Document
8
Function of this Document
8
Target Group
8
Revision History
8
Language
8
Illustrations
8
Units of Measurement
8
Typographical Conventions
9
How to Use this Document
9
General Symbols and Signal Words
9
Special Symbols for Warnings and Dangers
10
Related Documents
10
Manufacturer and Contact Data
11
Abbreviations
11
Terminology
12
Orientation Agreements
13
Description
14
Type Plate
14
Intended Use
14
Working Principles
16
Terra X4 Variants CC and CJ
16
Terra X4 Variant C
18
Overview
19
Overview of the System
19
Overview of the EVSE, Outside
20
Overview of the EVSE, Inside
21
Authorization to Charge
22
Payment Terminal
22
Options
22
EV Charge Cable, CCS 1
22
EV Charge Cable, CCS 2
23
EV Charge Cable, Chademo
23
Integrated Payment Terminal
23
Cable Management System
23
Power Allocation Strategies
24
Sequential Charge
24
Concurrent Charge
24
Dynamic Charge, First in First Served
25
Dynamic Charge, Shared Power
25
External Residual-Current Device
26
Description of the Touchscreen
27
General Description of the Layout
27
General Description of the Buttons
27
Local Service Portal
28
General Description of the Pages
28
General Description of the Buttons
28
Cloud Service Portal
29
General Description of the Layout (Content Is AC to Use as Canvas for Input)
29
General Description of the Menus
30
Safety
31
Liability
31
General Safety Instructions
31
Responsibilities for the Owner
31
Required Qualifications for the Installation Engineer
32
Personal Protective Equipment
32
Safety Instructions During Installation
33
Safety Instructions During Transport
33
Safety Instructions for Earthing
33
Safety Instructions for Use
34
Signs on the EVSE
34
Discard the EVSE or Parts of the EVSE
35
Cyber Security
35
Inspection and Transport
36
Transport the EVSE to the Site
36
Unpacking
36
Unpacking Procedure
36
Do a Check on the Transport Sensors
36
Remove the Cabinet from the Pallet
37
Transport the EVSE on the Site
37
Hoist the Cabinet
37
Move the Cabinet with a Forklift Truck
38
Installation
40
General Installation Procedure
40
Site Preparation
40
Prepare the Site
40
Control the Space and Airflow Around the Cabinet
41
Prepare the Foundation
41
Prepare the Foundation - General Procedure
41
Prepare a Casted Foundation
42
Prepare a Standard Prefab Foundation
42
Mechanical Installation
42
Mechanical Installation Procedure
42
Open the Cable Inlet and Remove the Cable Gland
43
Guide the Cables through the Opening in the Cable Guide Plate
43
Install the Cabinet on the Foundation
44
Electrical Installation
44
Electrical Installation Procedure
44
Connect the PE Wire
45
Connect the Enclosure to the Earth
45
Connect the Wires of the AC Input Cable
46
Connect the Ethernet Cable
47
Prepare for Commissioning
48
Operation
49
Prepare before Use
49
Stop the EVSE if There Is an Emergency
49
Reset the EVSE after an Emergency
50
Charge Session
50
Charge an EV
50
Start a Charge Session
50
Stop a Charge Session
51
Energize the EVSE
51
De-Energize the EVSE - General Procedure
51
Measure the AC Voltage
52
Measure the DC Voltage
52
Remove Condensation from the Cabinet
53
Local Service Portal
54
Start the Local Service Portal
54
Set the Configuration Parameters
54
Set the OCPP Parameters
54
Install New Software
54
Close the Local Service Portal
54
Maintenance and Cleaning
56
Maintenance Schedule
56
Clean the Cabinet
56
Do a Check on the Cabinet
57
Replace the Air Inlet Filter
57
Replace the Air Outlet Filter
58
Access to Parts
60
Open the Doors
60
Close the Doors
60
Remove the Border Covers
61
Install the Border Covers
61
Troubleshooting
63
Troubleshooting Procedure
63
Troubleshooting Table
63
Technical Data
64
EVSE Type
64
General Specifications
65
Parts Included in the Delivery
65
Required Tools for Installation
66
Required Parts for Installation
66
Torque Specifications
67
Maintenance Schedule for the Service Engineer
67
Ambient Conditions
67
Mass
68
Center of Gravity Location
68
Noise Level
68
Spare Parts
68
Cleaning Specifications
69
Transport Specifications
69
Dimensions
69
General Dimensions
69
Cable Slack
70
Floor Space Requirements
70
Prefab Foundation
71
Casted Foundation
72
Communication Interface Specifications
73
AC Input Specifications
73
General AC Input Specifications
73
AC Input Cable
74
Terra 94
74
Terra 104
75
Terra 124
75
Terra 184
75
DC Output Specifications
76
General Specifications
76
Terra 94
76
Terra 104
78
Terra 124
82
Terra 184
86
Power Consumption
90
In-Rush Current
91
Advertisement
Advertisement
Related Products
ABB Terra 54 Series
ABB Terra DC wallbox
ABB Terra HP
ABB Terra DC Wallbox UL
ABB Terra T54 C
ABB Terra T54 CJ
ABB Terra T54 CJG
ABB Terra T54 CT
ABB Terra 104 North America
ABB Terra 104
ABB Categories
Industrial Equipment
Controller
Measuring Instruments
Battery Charger
DC Drives
More ABB Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL