Crldv/Clldv Framing - Vermont Castings STLDVNSCSB Installation And Operating Instructions Manual

Designer series direct vent gas fireplace
Table of Contents

Advertisement

INSTALLATION INFORMATION

CRLDV/CLLDV FRAMING

Remove box and
Insulation for Top
Vent Configurations
Noncombustible
Material
If using 5/8" drywall,
remove framing
tabs and re-install
on 2nd set of holes
positioned slightly
inwards
Fold Outer Tabs
and Nail to Framing
Members
Figure 6 -
CRLDV and CLLDV (Corner) Framing
The fireplace must be secured to the floor and/or to framing
studs as shown in Figure 6 . Use four (4) wood screws or
masonry/ concrete screws to secure fireplace to the floor.
Use four (4) screws to attach fireplace to framing. The side
brackets or nailing flanges are designed to accommodate
two wall boards thicknesses, 1/2" or 5/8".
20306750
27¹⁄₂" (699 mm)
(1/2" Drywall)
or
27³⁄₈" (696 mm)
(5/8" Drywall)
FP2849
corner framing
Designer Series Direct Vent Gas Fireplace
46¹⁄₈" (1172 mm)
(1/2" Drywall)
or
46" (1168 mm)
(5/8" Drywall)
If using 5/8" drywall, remove
noncombustible supports, rotate
180° and reinstall to achieve
5/8" depth
The area above and on the sides of the
fireplace must be a noncombustible material.
Figures 5, 6, 7
Never install combustible materials over
front face of fireplace.
48³⁄₁₆"
(1224 mm)
If using 5/8" drywall, remove
framing tabs and re-install
on 2nd set of holes
positioned slightly inwards
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents