TMI Products VD56B Technical Manual & Parts Catalogue

TMI Products VD56B Technical Manual & Parts Catalogue

Advertisement

Quick Links

Revised on : 12. Nov. 2010
TECHNICAL GUIDE
&
PARTS CATALOGUE
Cal.VD56B
ANALOGUE QUARTZ
SII Products

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the VD56B and is the answer not in the manual?

Questions and answers

Summary of Contents for TMI Products VD56B

  • Page 1 Revised on : 12. Nov. 2010 TECHNICAL GUIDE & PARTS CATALOGUE Cal.VD56B ANALOGUE QUARTZ SII Products...
  • Page 2: Parts Catalogue / Technical Guide

    PARTS CATALOGUE / TECHNICAL GUIDE Cal.VD56B Version-03 [SPECIFICATION] Cal. No. VD56B Item Movement φ 29.50 mm ( 12H - 6H ) × 26.00 mm Outside diameter Movement φ 28.80 mm ( 12H - 6H ) Casing diameter     size Total height 3.97 mm...
  • Page 3: Parts Catalogue

    Version-03 PARTS CATALOGUE VD56B ⇒ Disassembling procedures Figs. Lubricating : Types of oil Oil quantity ⇒ Reassembling procedures Figs. Moebius A Normal quantity Moebius F Hour, minute second hands Chronograph minute, second and 1/10 second hands 0012 079 24-hour indicator...
  • Page 4 Version-04 PARTS CATALOGUE VD56B Battery 0351 178 Winding stem 0012 079 Switch spring screw 0012 079 Switch spring screw 4245 401 Switch spring 0012 079 Train wheel bridge (B) screw 4004 259 0125 331 Circuit block Train wheel bridge (B)
  • Page 5 Version-03 PARTS CATALOGUE VD56B 0125 248 Train wheel bridge (A) 0241 177 Fourth wheel and pinion 0701 904 0231 904 Fifth wheel and pinion (A) Third wheel and pinion 4146 890 Step rotor (A) 0261 034 0221 156 Minute wheel and pinion...
  • Page 6: Technical Guide

    Version-02 TECHNICAL GUIDE VD56B ・The explanation here is only for the particular point of Cal.VD56B Tweezers 1.REMARKS ON INSTALLING THE BATTERY 1) After the battery is replaced with a new one or after the battery is reinstalled following the repairing procedures,...
  • Page 7 Version-03 TECHNICAL GUIDE VD56B 1.REMARKS ON INSTALLING THE BATTERY (1) HAND ・How to install the hands Place the movement directly on a flat metal plate or the like and press in the hands. * Install the hour , minute and second hands at the "12"o'clock position.
  • Page 8: Operation

    Version-02 OPERATION VD56B DISPLAY AND CROWN / BUTTON OPERATION Minute hand Stopwatch 1/10 second hand (Move in 1/10 second increments) Hour hand Button A In stopwatch function Stopwatch minute hand Start / Stop (Move in minute increments) Time setting Second hand...
  • Page 9: Time Setting

    Version-02 OPERATION VD56B TIME SETTING *Before setting the time , check that the chronograph measurement is stopped. Crown 1.Pull out the crown when 2.Turn the crown to set the 3.Push the crown back in to the second hand is at...
  • Page 10 Version-02 OPERATION VD56B (Accumulated elapsed time measurement) A / A ・・・ Ex) Basketball game (Press the buttons in the following order RESTART ・・・ START STOP STOP RESET (Restart of game) (Game over) (Start of game) (Time out) 5 minutes 10 seconds...

Table of Contents