CashFlow
Installing or removing the CashFlow
following these simple instructions.
+ When installing the CashFlow
the following instructions will always apply.
+ The mounting channel for the CashFlow
manufacturer, and therefore some variations may exist from machine to machine, however in
principle these instructions still apply.
CF126 Front Entry Installation
q Connect the separator loom to the connector at the base of the validator and locate
the rectangular boss on the top of the separator into the base of the validator.
q Firmly screw the separator fixing lugs onto the rear of the validator.
q Having ensured that the front plate has a firm location onto the front of the
machine, insert the side of the validator onto the two round bosses at the rear of
the front plate and push firmly together until the two retaining clips are fully
engaged.
6
®
®
126 and CashFlow
129 selectors User Guide
INSTALLATION
product from your machine can be done by
® ®
126 Front Entry product it will be fitted to an MEI Front Plate and
® ®
126 top entry product is supplied by the machine
® ®
©, Mars, Inc., 1998