Pressure And Temperature Gauge; Differential Pressure Switch - Vaillant TURBOmax VUW 242 E Instructions For Installation And Servicing

Wall hung room sealed fan assisted combination boilers
Hide thumbs Also See for TURBOmax VUW 242 E:
Table of Contents

Advertisement

7.15.1 Replacement of water section
diaphragm (fig. 72).
Turn off boiler as in Section 7.1.1.
Remove bottom cover as in section
7.1.3.3.
Open hot water taps.
Remove clip (2), undo union (3)
Remove 6 screws (4).
Pull water section base away from
DHW heat exchanger and drop
down.
Remove diaphragm.
Replace in reverse order.
Carry out electrical checks (see
section 5.1).
Refill and repressurise the boiler
(see section 5.4).
7.16 Replacement of pressure
and temperature gauge
Turn off boiler as in section 7.1.1.
Remove front casing as in section
7.1.3.
Release CH water pressure and
drain boiler as in section 7.1.2.
Lower front control panel as in
section 7.1.6.
Undo union (2, fig 71) on diverter
valve to release pressure gauge
tube.
Remove temperature gauge phial
from pocket on primary flow pipe.
Press spring clips on side of gauge
to remove from front panel.
Replace in reverse order.
Refill and repressurise the boiler
(see section 5.4).
7.17 Replacement of differential
pressure switch
Turn off boiler as in section 7.1.1.
Remove front casing as in section
7.1.3.
Release CH water pressure and
drain boiler as in section 7.1.2.
Lower front control panel as in
section 7.1.6.
Remove clip at rear of switch by
pulling it to the left.
Disconnect wires from switch (1,
fig. 73).
Pull pressure differential switch
forward to remove.
Reassemble in reverse order.
Carry out electrical checks (see
section 5.1).
Refill and repressurise the boiler
(see section 5.4).
Supplied By www.heating spares.co Tel. 0161 620 6677
fig. 72
fig. 73
41

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Turbomax vuw 282 e

Table of Contents