Remove The Packaging - GE PSB9100DF Installation Instructions Manual

Advantium 120v built-in speedcook ovens
Table of Contents

Advertisement

Available languages

Available languages

Installation Preparation
PREPARE THE OPENING CCONT.I
Installation
over a GE Oven:
17-1/2"
Construct
Solid
Bottom Hin.
3/8" Plywood
Supported
by
2x4orlx2
Runners oll
Four Sides
2" Min.
Per Oven
Requirement
*If you ore replacing
u GE electric double oven
with the combined
instollotion
of on Advontium
120 undo
single oven, use the dimensions
shown.
The middle toil seporuting
the two openings muy
need to be lurger thun the 2" minimum
shown.
PREPARE THE OPENING
ICONT.}
Installation
over
a GE Oven
and Warming
Drawer:
Construct
27"--
23-1/2"
Solid Bottom
Hin. 3/8"
Plywood
Supported by
2x4orlx2
Runners all
Four Sides
45-1/4"
- 2" Min.
Per Oven
Requirement
2" Min.
NOTE: Additionul
cleurunces
between the cutouts
muy be required. Check to be sure the oven
supports obove the Worming
Drower locution do
not obstruct
the required interior depth ond height.
See Worming
Drawer installation
instructions
for
detuils.
CAUTION: For
p ersonul sofety,
the
mounting
surfuce must be cupoble of supporting
the cabinet loud, in uddition to the udded weight
of the 75-pound
product, plus udditionul
oven
Ioods of up to 50 pounds or o totol weight of 125
pounds.
REMOVE THE PACKAGING
• Lift the oven out of the corton.
• Remove oil pocking moteriol und tope.
• Open the door und remove ports box.
• Locote ports pockoge contuining
mounting
screws.
7

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Psb9100sf

Table of Contents