Download Print this page
Frigidaire FFRE08C3Q12 Installation Instructions
Frigidaire FFRE08C3Q12 Installation Instructions

Frigidaire FFRE08C3Q12 Installation Instructions

Hide thumbs Also See for FFRE08C3Q12:

Advertisement

READ BEFORE
INSTALLING
UNIT
MSII Window
Mounting
(5,000-8,000
BTU)
The unit is for window mounting only.
Carefully read the installation manual before beginning.
Follow each step as shown.
Observe all local, state, and national electrical codes and by qualified, licensed, authorized personnel only.
Pay attention to danger and safety notices.
To avoid risk of personal injury, property damage, or product damage due to the weight of this device and sharp edges that may
be exposed:
Air conditioners covered in this manual pose an excessive weight hazard. Two or more people are needed to move and install
the unit. Wear protective gloves whenever lifting or carrying the unit. AVOID the sharp metal fins of front and rear coils. To
prevent injury or strain, use proper lifting and carrying techniques when moving unit.
Carefully inspect location where air conditioner will be installed. Be sure it will support the weight of the unit overan extended
period of time.
_: Handle air conditioner
with care.
Make sure air conditioner
does not fall during installation.
• SAVE CARTON and these INSTALLATION
INSTRUCTIONS
for future reference. The carton is
the best way to store unit during winter, or when not
in use.
e DO NOT USE ANY SCREWS OTHER THAN
THOSE SPECIFIED
HERE.
• FOR SAFETY REASONS, THE TOP RAIL MUST BE
SECURELY FASTENED WITH ALL FOUR (4)
SCREWS.
Some assembly
is required. Please read these instructions
carefully.
Top Rail Hardware
Qty.
3/8" Screw
4
Top Rail
1
f
Mounting
Hardware
1/2" screws
lock frame
(For Wooden
windows)
lock frame
(For
Vinyl-Clad
windows)
_i._
_
sash lock
weather seals
(6"X3/4"X1112")
window sash seal foam
\
TOOLS NEEDED
Philips
Screwdriver
• Drill (If pilot holes are needed)
Before installing, the top rail must be assembled on the unit.
A. Remove the air conditioner
from the carton and place on a flat surface.
B. Remove top rail from the rear of the packaging material as shown in Fig. A
C. Align the hole in the top rail with those on the top of the unit as shown in Fig. B
D. Secure the top rail to the unit with the 318" Screws as shown in Fig. C
Packa(
Cy.
7
2
2
t
5
1
I' Fig. C
Rail
2020211A2575

Advertisement

loading