PUMP KITS PARTS LIST KIT - 06001 KIT - 06002 4. P0600 – 600 GPH PUMP 4. P0600 – 600 GPH PUMP 5. H16NK – 4’ OF 1” NON KINK VINYL HOSE 5. H12NK – 4’ OF 1” NON KINK HOSE (QTY 2) 6.
Page 4
STEP 2 Remove the template from the area and dig a hole for your liner. You will want to position the liner an inch or two higher than the surrounding ground to prevent runoff. For softer soil you may need to dig a 3” deeper hole and filled to the desired depth with sand.
Page 5
STEP 5 Insert the assembly into the reservoir. Keep in mind the pump need accessible at various times such as adjusting flow outputs of the bubbler, Make sure to guide the cord out of the liner to nearest GFI outlet. more pump information see instructions included...
STEP 9 Now that all adjustments have been made the fountain is now ready for landscaping. Place crushed stone or rock on grating and landscape as desired. MAINTENANCE WINTERIZATION In colder climates where temperatures can reach below 32 degrees Fahrenheit it is recommended that all water be removed from the fountain kit.