Lmppos WBS-3 Quick Reference Manual

Wireless barcode scanner

Advertisement

Quick Links

Wireless Barcode Scanner
Quick Reference Guide
VER: TS45_QG_EN_V1.1.0
Scanner & Cradle
①Power Indicator
③Trigger
②Data Indicator
④Exit Window
①.Pairing
⑥.Reserve
②.Channel Increase
⑦.Power interface
③.Channel Decrease
⑧.Data interface to connect PC
④.Power Indicator
⑨.Adjust button
⑤.Data Indicator
⑩.Antenna
Installation
Step1.
Refer to the below pictures, connect the cradle to host (e.g. PC)
with different cables firstly, and then connect the adaptor to the power
socket.
USB: USB cable RJ45 connect cradle ⑧, the other side connect PC.
USB cable
P/S2 cable RJ45 connect cradle ⑧, the other side to connect PC
P/S 2:
and P/S2 port keyboard
P/S2 keyboard cable
side to connect ⑧ ,the other
RS232:
RS232 cable RJ45
side to connect PC.
cable
RS232
Typically, cradle is able to identify the data port type automatically. In
extreme cases cradle port may need setting manually if the host fails to
identify it.
Note: Pairing before set interface type.
Automatic Identification
(Default)
USB
PS/2
RS232
Step 2.
Put the scanner onto the cradle like below picture.
Place the Scanner
Step3.
Press cradle middle button①(P)for about 4 seconds, until
the Scanner issued a "beep beep" sound.
Note: A cradle is able to work with as more as 100 scanners at the
same time. After a Scanner pairing with Cradle, the cradle can
receive the data from the scanner.

Usage of Scanner

Power Up/Power Down

Scanner will be power up when the trigger is clicked. When the scanner
is not operated for 30s, it will enter power down mode automatically

Charging

Position the scanner onto the cradle.
Note : The scanner power indicator becomes green and keeps
flashing when the scanner is low power.

Built-in Data Memory

When the scanner is out of communication area of the cradle, the
scanner will save the barcode data in built-in data memory. The scanner
will send the data to the cradle automatically when the scanner gets back
to the communication area.
The scanner data indicator will become red. After finish sending data,
the indicator will to be green.

More Than One Cradle Work In The Same Space

When there are more than one cradles working in the same space, it is
better to set every cradle work in different channel. Channel is set as
follows:
1. Open a notepad or other text editor.
2. Press the cradle Channel increase or decrease button.
3. Pairing the scanner and cradle.
Note: After changing the channelof a cradle pairing is need.
When more than one cradle work in the same channel, it will reduce the
bar code data transmission speed, but no any other problems.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the WBS-3 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Lmppos WBS-3

  • Page 1 Scanner & Cradle Installation same time. After a Scanner pairing with Cradle, the cradle can receive the data from the scanner. Step1. Refer to the below pictures, connect the cradle to host (e.g. PC) Wireless Barcode Scanner with different cables firstly, and then connect the adaptor to the power Usage of Scanner socket.
  • Page 2 Indicator & Button Auto-Store Mode (Default) Common Settings Suffix NO-Store Mode Scanner Indicator Suffix(Default) Manual Transmission Mode Set Defaults Status Left Light Do Not Transmit Suffix Set Defaults Scan Success Bright Red 1sec Bright Red 1sec Start transfer Bar Code Data (for Manual Transmission Mode) Power on Green Scan Suffix (0~22 chars, 2 Digits/Char;...

Table of Contents