Download Print this page

United Vision Solutions EV3000-PT-EXIR Operation And Maintenance Manual page 6

Explosive - proof pt for flir uncooled ir cameras

Advertisement

3.1 Wiring
3.1.1 The power box must be installed near EV3000-PT within 20 ft
, and the DC24V should be supplied using AWG16 wires.
3-1-2. The built-in receiver address is set to "1" and Baud rate is set to 2400 bps,
the unit controlled using any Pelco-D keyboard.
3-1-3. Connections

Advertisement

loading