Specifications; Standard Accessories; Applications; Prior To Operation - Hitachi PH-65A Handling Instructions Manual

Demolition hammer
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 4
DEMOLITION HAMMER SAFETY WARNINGS
1. Wear ear protectors.
Exposure to noise can cause hearing loss.
2. Use auxiliary handles supplied with the tool.
Loss of control can cause personal injury.
3. Wear protective glasses to protect your eyes.
4. Wear a mask when turning your head upward.
5. Properly set the bit holder.

SPECIFICATIONS

Voltage (by areas)*
Power Input
Full-load impact rate
Weight (without cord)
* Be sure to check the nameplate on product as it is subject to change by areas.

STANDARD ACCESSORIES

(1) Case .............................................................................1
(2) Bull Point (Total Length 410 mm) ..................................1
(3) Oil Feeder .....................................................................1
(4) Wrench .........................................................................1
Standard accessories are subject to change without notice.
OPTIONAL ACCESSORIES (sold separately)
○ Cutter (for crushing asphalt)
Total length:
Width:
Code No.:
○ Cold Chisel
(for grooving and squaring)
Total length:
Code No.:
○ Rammer
(for tamping sand and gravel)
Rammer + Shank
Rammer
Out diameter:
Code No.:
Shank
Total length:
Code No.:
○ Scoop
(for digging ground in various foundation work)
Total length:
Code No.:
6. Since the bit becomes very hot during operation, exercise
7. Safe operation depends on one's stable posture.
8. At the start of work, confi rm the oil supply and screw
9. When working at a highly elevated location, pay attention
10. Before starting breaking or chipping a wall, fl oor, or
11. Wear protective shoes to protect your feet.
(110 V, 115 V, 120 V, 127 V, 220 V, 230 V, 240 V))
○ Electric Hammer Oil (one liter)
Optional accessories are subject to change without notice.

APPLICATIONS

Crushing concrete, chipping, digging, and squaring.
Application examples:
Installation of piping and wiring, sanitary facility installation,
machinery installation, water supply and drainage work,
interior jobs, harbor facilities and other civil engineering
works.

PRIOR TO OPERATION

410 mm
1. Power source
75 mm
944964
2. Grounding
410 mm
944962
3. Power switch
4. Extension cord
200 mm
944965
5. Feeding oil (refer to the paragraph on oil feeding)
250 mm
944966
6. Mounting a tool
NOTE
380 mm
957154
extremes very hot.
tightening.
to articles and persons below.
ceiling, thoroughly confi rm that no items such as an
electric cable or conduit are buried inside.
1240 W*
1400/min.
15 kg
(Code No.: 955009)
Ensure that the power source to be utilized conforms
to the power requirements specifi ed on the product
nameplate.
This tool should be grounded while in use to protect the
operator from electric shock. The tool is equipped with a
three conductor cord and grounding type plug to fi t the
proper grounding type receptacle. The green (or green
and yellow) conductor in the cord is the grounding wire.
Never connect the green (or green and yellow) wire to a
live terminal.
Ensure that the power switch is in the OFF position. If the
plug is connected to a receptacle while the power switch
is in the ON position, the power tool will start operating
immediately, which could cause a serious accident.
When the work area is removed from the power source,
use an extension cord of suffi cient thickness and rated
capacity. The extension cord should be kept as short as
practicable.
Prior to using the power tool, remove the oil gauge and
do not fail the oil tank with the provided oil. (Although the
oil tank is built in, it contains only a small volume of oil
when shipped from the Hitachi Works.)
When handling bull point, cold chisel and other
accessories, Hitachi standard tools are recommended
for better operation.
English
4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents