Ashley AGDV8 Owner's Operation And Installation Manual page 15

Gravity direct vent wall furnace
Table of Contents

Advertisement

The correct flame pattern should be viewed by looking through the view port on top of the unit (Fig. 22).
The correct flame pattern of pilot and main burner are shown in figures 23, 24, 25 and 26.
PRIMARY FLAME: 1/4´´ - 3/8´´ (6 - 10 mm)
SECONDARY FLAME: 2´´ - 4´´ (50 - 100 mm)
Correct main burner flame pattern
Cleaning the Main Burner Orifice and Main Burner
1. Turn OFF gas supply to the heater.
2. Remove casing assembly.
3. Disconnect burner tubing and remove orifice holder.
4. Apply compressed air the orifice holder assembly to remove dust, lint or spider webs.
5. Apply compressed air through the hole on the combustion chamber wall where the orifice holder was originally
located to remove dust, lint or spider webs.
6. As parts are being replaced in reverse order, check for gas leaks at all gas connections before replacing the
casing assembly.
Fig. 23
Correct main burner flame pattern (top view)
SECONDARY FLAME
PRIMARY FLAME
PILOT FLAME
THERMOCOUPLE
Correct main burner flame pattern (top view)
Model AGDV20
Correct pilot burner flame pattern
SECONDARY FLAME
PRIMARY FLAME
PILOT FLAME
THERMOCOUPLE
Fig. 25
Models AGDV8 and 12
Fig. 26
Model AGDV20
15
PILOT FLAME
THERMOCOUPLE
Models
AGDV8 and 12
Fig. 24

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Agdv20Agdv12Gravity agdv8Gravity agdv12Gravity agdv20Gravity agdv12l ... Show all

Table of Contents