Lincoln Electric INVERTEC V300-PRO SVM105-B Service Manual page 49

Lincoln electric welder user manual
Hide thumbs Also See for INVERTEC V300-PRO SVM105-B:
Table of Contents

Advertisement

F-19
PROTECTION BOARD OUTPUT TEST(cont.)
TEST PROCEDURE
8. With power OFF, disconnect J8 and attach voltage
probes into back of wire harness lead junction
block (J8). See Figure F.5.
Insert probes into back of the connection cavities
for leads 313 (-) and 311 (+) of Protection Board.
Make sure contact is made with conductor materi-
al.
NOTE: Right-angle, thin-gauge probes are best
for this test.
With probes attached, plug the (J8) block into the
PC board.
306
275F
TROUBLESHOOTING & REPAIR
FIGURE F.5 - INSERTING PROBES
L7915
PROTECTION
313
J8
311
V300-PRO
9. Turn main power ON.
10. Move Output Terminal Switch S4 to ON position on
Control Panel.
11. Test for less than 1 VDC between leads 313 (-) and
311 (+).
a. If less than 1 VDC is measured, test is OK and
Protection Board is functioning properly.
b. If more than 5 VDC is measured, go to Static
Capacitor Balance Test.
NOTE:. During voltage test, be cautious when
positioning loose components to avoid shorts and
damage to equipment.
F-19
J15

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Invertec v300-pro

Table of Contents