Membrane Installation - Water Tec CP Operating Manual

Reverse osmosis systems
Table of Contents

Advertisement

the brine seal direction consists of pre-treatment
Initial Testing (continued)
After the quality test you should also test all the electrical equipment. Disconnect the Liquid Level Switch
wires and look for these four things:
The pump should automatically shut down.
There should be continuous flow from the unit to product and waste as the unit drains.
After the short drain out period the flow should completely stop.
The Power On Indicator should remain on.
Reconnect the Liquid Level Switch wires. The pump should automatically turn on. Pressure should increase
and water should start to flow to product and waste.
Ideal Installation
Incorrect Installation
Water Tec Int'l. Inc.

MEMBRANE INSTALLATION

*
Flow
*
Flow
The brine seal should always be
installed on the same side as the
incoming water.
*
Note the direction of the brine seal.
Acceptable Installation
18
*
Flow
Version 02A