3. Getting started – regards complete IR detection kit

3.1. Unpacking

Before unpacking, verify if there are no visible damages of the package. Report them to the manufacturer or
the distributor.
3.2. Installation & connections
Mount the IR module in the measurement setup,
Connect all elements with cables provided in the package,
Make sure that all the elements are properly connected.

3.3. Switching on procedure

• Do not switch on the IR module power supply until ALL elements of the IR detection kit are properly connec-
ted with the proper cables,
• Switch on the thermoelectric cooler controller and wait until detector operating temperature is reached and
stabilized. Ready state will be indicated by the „LOCK" green LED light,
• Before starting the measurements make sure the load resistance is valid. IR module output should be termin -
ated by 50Ω or 1MΩ resistance depending on the bandwidth and is given in the test data provided on the
module,
• Do not manipulate any connectors on the active IR kit – this may introduce additional noises to the system or
can cause severe damages due to electrostatic discharges.
129/133 Poznanska St., 05-850 Ozarow Mazowiecki, Poland; tel. +48 22 733 54 20; fax +48 22 733 54 26; e-mail:
Please note: the information contained in this document is subject to change without further notification. VIGO System reserves the right to alter the performance and any resulting specifications.VS- 11-08-16MB
info@vigo.com.pl
8

Advertisement

Table of Contents
loading

Table of Contents