Download Print this page

Dust Care 4000 Quiet Series Installation Manual

Central vacuum systems

Advertisement

Quick Links

Advertisement

loading
Need help?

Need help?

Do you have a question about the 4000 Quiet Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Dust Care 4000 Quiet Series

  • Page 2: Table Of Contents

    INDEX Your machine GENERAL INFORMATION Model number: PLANNING Serial number: Tools Required Planning Date of purchase: Power Unit Location Wiring (110V/60 cycles) Inlet Valves Locations A word of caution EXISTING CONSTRUCTION From the attic down GENERAL INFORMATION From the basement up Gaining acces to pipe run through carpeted floor Important electrical information NEW CONSTRUCTION ROUGH-IN...
  • Page 3: Tools Required

    PLANNING Appliance installation Tools Required • Avoid placing objects on your machine. Make sure that nothing blocks Steel Tape Measure • Phillips Screw Driver • Wire Cutters • Keyhole Saw or penetrates the ventilation openings of the motor. Hammer • Chisel • Wire Coat Hanger • 2 1/2" Hole Saw • 1/2" Electric Drill •...
  • Page 4: Wiring (110V/60 Cycles)

    Simply lay the string from the proposed Inlet valve location into every corner of In condominiums and townhouses even a closet the areas you intend to reach from that particular inlet. with louvered doors will serve as a very suitable out-of-the way location.
  • Page 5: From The Attic Down

    EXISTING CONSTRUCTION The main line connects the entire system from the inlet valves to the power unit. It carries the low-voltage wire along its entire run. During the layout process From the attic down you checked carefully for possible obstructions along the intended run, such as In order to find where to drill the holes for the branch lines into the plates, establish a double joists, ducts, electrical wiring or water lines.
  • Page 6: From The Basement Up

    Cold air returns, crawlspaces and the underside of staircases will serve as accessible ducts. Your system's main run will then be concealed at the same time as spaces, through which the main run can pass. furnace ducts and plumbing-lines are boxed-in and covered. "B-Vent"...
  • Page 7: Cold Air Return Ducts

    edges of the floor joists you will be able to drill without impairing the bearing strength of the joist member. The Hayden 90° Sweep Tee must be turned completely on its side (90° to its axis) and connected and glued to branch from inlet. After installation is complete the underside of the floor joists may be completely covered.
  • Page 8: Floor Installation - Vinyl Or Lino

    approx. 5/8" in diameter must be drilled in the plate close to the pipe, so that the Insert a 2 1/4" pipe sleeve and slip into a 45° Ell (stock no. 2008-HXH ) again using the electrical wire can be easily pulled through. Affix the included wall clip as per instruc- 45°...
  • Page 9: Notes

    NOTE: 45° increments for proper 45° alignment. Insert pipe into upper hub of 45° Ell. Repeat The use of the 90° Ell (stock no. 2004-HXH) is or 4" walls, while the special short step "B" of fig. 1 (illustration 4). 90°...
  • Page 10 DO-IT YOURSELF KIT NOTES SWEEP 90° TEES SWEEP 90° ELLS 2 per three inlet kit 9 per three inlet kit 3 per one inlet kit 1 per one inlet kit SHORT 90° ELLS 45° ELLS 3 per three inlet kit 6 per three inlet kit 1 per one inlet kit 2 per one inlet kit...
  • Page 11 Dust Care division of BVC Smyrna Ga. 30080...