Download Print this page

Dacor EWC240 Training Manual

Wine chiller

Advertisement

Quick Links

DACOR
DACOR Service Training
The installation of this product includes an on-site handle. Installation is not required and door reversing does not
require drilling. The leveling legs are factory-installed and need only to be adjusted on-site.
The wood fronts on the wire racks can be stained to match the cabinetry. Please read the installation instructions for all
pertinent installation information.
The nomenclature tag is located on the interior ceiling of the unit. The Mini Manual is taped to the right front corner of
the unit behind the toekick.
Training Bulletin
New Model Introduction
Wine Chiller EWC240
Beverage Center EBC240

Advertisement

loading

Summary of Contents for Dacor EWC240

  • Page 1 DACOR New Model Introduction DACOR Service Training Wine Chiller EWC240 Beverage Center EBC240 The installation of this product includes an on-site handle. Installation is not required and door reversing does not require drilling. The leveling legs are factory-installed and need only to be adjusted on-site.
  • Page 2: Temperature Control

    Factory-Installed Handle and Leveling Legs only be seen when the door is open. The door handle and the leveling legs on the Dacor Wine Chiller and Beverage Center are installed during the production of the units. On-site installation is not required for these parts.
  • Page 3: Control Panel

    When reinstalling, note the longer screws hold the Door Reversibility retaining clip while the shorter screws secure the The door swing of these units can be reversed. The control panel. door swing should be changed before installation. Refer to the Installation Instructions for further Evaporator information on the procedure.
  • Page 4 Wiring and Schematic...

This manual is also suitable for:

Ebc240