Alcove Installation - Thermo Pride GMD1-60N Installation And Service Manual

Gas-fired furnace down flow & direct vent (sealed combustion)
Table of Contents

Advertisement

All installations and services must be performed by qualified service personnel.
c CAUTION: A permanent opening with a minimum of 50 square inches of
unobstructed infiltration (free area) for ventilation and combustion air must be
provided to the interior of the structure. Additional make-up air may need to be
supplied to the interior of the structure to compensate for exhaust fans,
appliances, or vents, which consume air from the interior of the structure.
Refer to the assembly installation instructions included with OM1COT-BASE cottage
base for additional information.
3. Coil Cabinet: CE111S / CE211T
The CE111S / CE211T coil cabinet (figure 1C) is for applications requiring air
conditioning. The coil cabinet is designed to have the combustion air brought in
from the bottom thru a flexible hose, supplied with the cabinet. Refer to section G
Combustion air of this manual for further instructions on the combustion air
termination and connections. For additional information refer instructions provided
with the coil cabinet.
E. ALCOVE INSTALLATION
In this application, a minimum of 18
inches of clearance must be provided
to the front of the unit.
Figure 4.
Alcove installations must use the No.
70 mobile home base.
Note – access to diagnostic view port.
Refer to section G. COMBUSTION AIR
for additional combustion air
requirements.
Figure 4
Refer to
14

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gmd1-80n

Table of Contents