INSTALLATION INSTRUCTIONS
WARNING
!
CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in personal
injury or death.
DO NOT use cement to join polypropylene venting
systems. Follow the polypropylene venting system
manufacturer's instructions for installing polypropylene
venting systems.
Figure 57
Combustion Air Pipe
Point elbow down towards
back of furnace
12" (256mm) minimum
60"(1524 mm) or
1 additional elbow maximum
CASING SIDE ATTACHMENT
COMBUSTION AIR PIPE
(NON-DIRECT VENT)

Installing the Vent Termination

Roof Terminations
A roof termination of any type will require a 4-in. (102 mm)
flashing for a 2−in. (50 mm ND) concentric vent or a 5−in. (127
mm) diameter flashing for a 3-in. (80 mm ND) concentric vent
kit. For two-pipe or single pipe vent systems, a flashing for each
pipe of the required diameter will be necessary.
It is recommended that the flashing be installed by a roofer or
competent professional prior to installing the concentric vent.
The terminations can be installed on a flat or pitched roof.
Concentric Vent
Single or multiple concentric vent must be installed as shown in
Figure 49. Maintain the required separation distance between
vents or pairs of vents as shown in Figure 49
clearance shown in Figure 60.
WARNING
!
CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in personal
injury or death.
DO NOT use cement to join polypropylene venting
systems. Follow the polypropylene venting system
manufacturer's instructions for installing polypropylene
venting systems.
NOTE:
Follow the instructions of the vent terminal
manufacturer. These instructions are provided as a reference
only.
50
to
L12F042
and all
Specifications subject to change without notice.
Gas Furnace: (F/G)9MVT, (F/G)9MXT, (F/G)9MXE
Cut one 4−in. (102 mm) diameter hole for 2−in. (50 mm ND) kit,
or one 5−in. (127 mm) diameter hole for 3−in. (80 mm ND) kit in
the desired location.
Loosely assemble concentric vent/combustion air termination
components together using instructions in kit.
Slide assembled kit with rain shield REMOVED through hole in
wall or roof flashing.
NOTE: Do not allow insulation or other materials to accumulate
inside of pipe assembly when installing it through hole.
Disassemble loose pipe fittings. Clean and cement using same
procedures as used for system piping. DO NOT CEMENT
POLYPROPYLENE FITTINGS.
Two−Pipe and Single−Pipe Terminations
Single and two pipe vent must be installed as shown in
Figure 49 and Figure 50. Maintain the required separation
distance between vents or pairs of vents as shown in
Figure 49 and Figure 50 and all clearance shown in Figure 60
or Figure 61.
NOTICE
RECOMMENDED
SUPPORT
TERMINATIONS
It is recommended that rooftop vent terminations in
excess of 36 inches (1.0 M) in vertical length be
supported by EITHER the Direct Vent Termination Kit
shown in Table 12 or by field-supplied brackets or
supports fastened to the structure.
Cut the required number of holes in the roof or sidewall for vent
and (when used) combustion air pipes. Sidewall holes for
two-pipe vent terminations should be side-by-side, allowing
space between the pipes for the elbows to fit on the pipes.
Holes in the roof for direct−vent (two−pipe) terminations should
be spaced no more than 18−in. (457 mm) apart to help avoid
vent gas recirculation into combustion air intake.
Termination elbows will be installed after the vent and (if used)
combustion air pipe is installed.
Sidewall Terminations
Concentric Vent
NOTE:
Follow the instructions of the vent terminal
manufacturer. These instructions are provided as a reference,
only.
Determine an appropriate location for termination kit using the
guidelines provided in section "Locating The Vent Termination"
in this instruction.
1. Cut one 4−in. diameter hole for 2−in. kit, or one 5−in.
diameter hole for 3−in. kit.
2. Loosely
assemble
concentric
termination components together using instructions in kit.
3. Slide assembled kit with rain shield REMOVED through
hole.
NOTE: Do not allow insulation or other materials to accumulate
inside of pipe assembly when installing it through hole.
4. Locate assembly through sidewall with rain shield
positioned no more than 1−in. (25 mm) from wall as
shown in Figure 49.
5. Disassemble loose pipe fittings. Clean and cement using
same procedures as used for system piping. DO NOT
CEMENT POLYPROPYLENE FITTINGS.
FOR
VENT
vent/combustion
air
440 01 4001 05

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

G9mvtF9mxeF9mxtG9mxeG9mxt

Table of Contents