Processes And Procedures; Boat Dimensions And Capacities - SEAS O’Day 28 Operating Manual

Table of Contents

Advertisement

 
 
All   s kippers   s hould   b e   f amiliar   w ith   t he   f ollowing   p rocesses   &   e quipment   l ocation.  
Processes   a nd   P rocedures:  
1. Process   f or   C leaning   R aw   W ater   S trainer   B asket.    
2. Process   f or   r emoving   c over   f rom   R aw   W ater   P ump,   r emoving   a nd   r eplacing   i mpeller  
and   r e-­‐installing   c over.  
3. Process   f or   R e-­‐Priming   R aw   W ater   P ump   i n   t he   e vent   p rime   i s   l ost   f rom   c leaning   t he  
strainer   o r   r eplacing   i mpeller.  
4. Process   f or   b leeding   a ir   o ut   o f   f uel   l ine   a t   H igh   P ressure   I njector   P ump   i nlet   u sing   h and  
pump   o n   R acor   F uel   F ilter.  
5. Process   f or   d raining   w ater   f rom   R acor   F uel   F ilter   W ater   S eperator   B owl   u sing   h ose   a nd  
fitting   o n   b ottom   o f   f ilter   b owl.  
6. Process   f or   s hutting   d own   e ngine   a nd/or   t hrottling   e ngine   f rom   e ngine   c ompartment   i n  
the   e vent   t he   t hrottle   c able   b reaks.  
7. Process   f or   s hifting   t ransmission   f rom   Q uarter   b erth   c ompartment   i n   t he   e vent   t he   s hift  
cable   b reaks.  
8. Process   f or   c hecking   o il   l evel   i n   e ngine   a nd   a dding   o il   i f   n ecessary.  
9. Process   f or   i nspecting   B attery   c able   c onnections   a nd   w ater   l evel   i n   b atteries.  
10. Process   f or   R eefing   b oth   M ainsail   a nd   J ib,   u sing   r eefing   l ines   a nd   w ebbing   a nd   s afety  
line   o n   C lew.  
Equipment   a nd   I tem   L ocations   t hat   s hould   b e   k nown:  
1. Location   o f   a ll   S eacocks   o n   t he   b oat   a nd   h ow   t o   c lose   t hem.  
2. Location   o f   K not   M etter   t hrough   h ull   a nd   e mergency   p lug.  
3. Location   a nd   i nstillation   o f   E mergency   T iller.  
4. Location   a nd   u se   o f   M anual   B ilge   P ump.  
5. Operation   o f   E lectric   B ilge   P ump   a nd   l ocation   a nd   r eplacement   o f   i n-­‐line   f use.  
6. Location   a nd   u se   o f   H andheld   F lares,   1 2   G a   F lare   G un   a nd   d istress   f lag.  
7. Location   a nd   u se   o f   F oam   E mergency   P lug.  
8. Location   a nd   u se   o f   W ire/Bolt   C utters.  
9. Location   a nd   u se   o f   T hrow   R ope.  
10. Use   o f   L ife   S ling.  
11.   L ocation   a nd   i nspection   o f   P rop   S haft   S tuffing   B ox.  
12.   L ocation   o f   B oat   d ocuments,   O perating   G uidelines,   M anuals,   R egistration   a nd  
emergency   k ey.  
Boat   D imensions   a nd   C apacities:  
1. Mast   H eight   a bove   W ater:   4 0   f t   p lus   a ntenna=43   f t  
2. Draft   4   f t   8   i nches   –   U se   6   f t   a s   m inimum   s afe   w ater   d epth  
3. Beam:   1 0   f t   3   i nches  
4. Fuel   T ank   C apacity:   1 8   g allons  
5. Holding   T ank   C apacity:   1 5   g allons  
6. Engine   O il   R eservoir:   2 .2   Q uarts  
Local   A rea   C hart:  
  1 .     M aptech   W aterproof   C hart   N umber   8   " New   Y ork   H arbor   &   A pproaches"  
Useful   A pps   f or   p hone,   t ablet   o r   i Pad:  
WindGuru   ( wind,   t emp,   c louds,   r ain,   p ressure,   w ave)   ( Keyport   a nd   S andy   H ook)  
TidesPlan11   ( Tide   c hart   w ith   d ata)   ( South   A mboy,   S andy   H ook)  
MarineTraffic   ( Commercial   S hip   M ovement   t racking   A IS   D ata  
Windbuoy   ( Buoy   D ata:   w ind,   t emp,   p ressure)   ( Sandy   H ook,   R obbins   R eef)  
SEAS O'Day 28 Boat Emergency Procedures
2
 

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for SEAS O’Day 28

Table of Contents