3.2

Unpacking and Inspection

3.2.1 Carefully open the packaging and remove the R2100RS. Verify that all
3.2.2 If damage has occurred during shipping, a claim should be filed with
3.3
Cautions and Warnings
3.3.1 Do not remove any factory-installed screws
3.3.2 Do not install near heat sources
3.3.3 ESD (Electro Static Discharge) guidelines shall be followed when installing
Document # 000004, V1.0, 07/24/2014
D) Circuit Overloading - Consideration should be given to the connection
of the equipment to the supply circuit and the effect that overloading of
the circuits might have on overcurrent protection and supply wiring.
Appropriate consideration of equipment nameplate ratings should be
used when addressing this concern.
E) Reliable Earthing - Reliable earthing of rack-mounted equipment
should be maintained. Particular attention should be given to supply
connections other than direct connections to the branch circuit (e.g. use
of power strips)."
F) System Maintenance - Maintenance and servicing of this product is to
be performed only by trained service personnel who are knowledgeable
on the procedures and hazards associated with this product.
G) Cautions and Warnings – All caution and warning instructions noted on
the product and in the manual should be followed (see Section 3.3 below
for details).
components have been included in the package per the packing list.
Inspect the unit for shipping damage.
Five9NS and an RMA shall be obtained from Five9NS.