START-UP, ADJUST & TEST
•
Follow the boiler manual instructions to clean the system
if needed, then fill and check water chemistry.
•
Start up the boiler as directed in the manual. Use a
combustion analyzer where specified.
•
Choose pre-loaded boiler settings, or customize settings
for various applications.
WIRE THE BOILER
•
Connect power wiring and control wiring per boiler
manual wiring diagram.
•
Connect system and DHW circulator wiring to the
terminals designated in the boiler manual.
INSTALL GAS PIPING
•
Install a union and shutoff valve.
•
No external drip leg is needed — it is already included in
the boiler's internal gas piping.
INSTALL CONDENSATE PIPING /
TUBING AND COMPONENTS
•
Fill out the material checklist in this guide to ensure you
have the tubing or PVC pipe and all components you will
need for the condensate piping.
•
Connection tee and internal components are supplied
with the boiler.
QUICK-START
QUICK-START
(Follow all instructions in Boiler manual)
8 8
7 7
6 6
5 5
4 4
BEFORE INSTALLING . . .
•
Make sure there is enough clearance for the boiler and all
water, gas and air piping. Verify vent/air termination can
be located as required.
•
All models are shipped with the items needed for propane
conversion except the Ultra-80, which requires a separate
conversion kit (see material checklist).
•
When wall mounting the boiler, obtain the wall-mount kit
(see material checklist).
Steps 2 – 6 can be done in any order —
just make sure that air, vent, water and gas
pipes will not interfere with one another.
INSTALL WATER PIPING
2 2
•
See information at right.
•
Refer to the material checklist in this guide for a list of
items needed.
INSTALL VENT & AIR PIPING
3 3
•
See vent / air piping options at left.
•
Refer to the material checklist in this guide for a list of
items needed.
CLICK HERE