Installation; Operating Instructions - NewAir AD-250 Owner's Manual

Hide thumbs Also See for AD-250:
Table of Contents

Advertisement

INSTALLATION

Before connecting the appliance to a power source, let it stand
upright for approximately 2 hours. This will reduce the
possibility of a malfunction in the cooling system from handling
during transportation.
P
LACEMENT
The NewAir AD-250 dehumidifier can be used in a variety of settings such as
bedrooms, living rooms, kitchens, and offices. Do not use this unit in
bathrooms.

OPERATING INSTRUCTIONS

T
D
URNING THE
EHUMIDIFIER
The knob on the control panel is used to power the dehumidifier. Turn the
knob to the ON position to turn it on. Turn it to the OFF position to turn it off.
P
I
OWER
NDICATOR
When the control knob is turned to the ON position, the power indicator light
will turn green. When the control knob is turned to the OFF position, the
indicator light will turn off.
When the water tank is full, the unit will shut off automatically and the full tank
indicator light will turn red.
O
N AND
L
IGHTS
A Name You Can Trust
7
O
FF

Advertisement

Table of Contents
loading

Table of Contents