LG MB-319ML Service Manual page 20

Table of Contents

Advertisement

COMPONENTS
HEATER ELEMENT
(Wire leads removed.)
MAGNETRON
THERMOSTAT
OVEN
THERMOSTAT
FUSE
(Wire leads removed.)
TEST PROCEDURE
Measure the resistance.
(Multi-meter scale:RX1)
Measure the resistance with 500V-100M
Ohm insulation resistance meter.
NOTE: Make sure heater is fully cooled when tested.
Check the continuity of the switch
with an Multi-meter
NOTE: If the fuse is blown, check primary, the secondary, the monitor
switches, H.V.D and H.V.C before replacing the fuse.
If the fuse is blown by improper switch operation replace the defective
switch and the fuse at the same time.
Replace just the fuse if the switches operate normally.
5-10
RESULTS
Normal:
Gill heater
Approx.15 ½
(at 20-30ûC)
Normal:
more than 1.0M ½
0ûC~Approx 180ûC
Approx 180ûC
0ûC~Approx 145ûC
Approx 145ûC
Normal
Abnormal

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mb-319mla

Table of Contents