Download Print this page

Advertisement

3. Assembly

Mechanical design, electrical connection and possible repair works must only be carried
out by qualified personnel. Only use original spare parts!
3.1 Assembly instructions
Prior to mounting, ensure that
● The site of cabinet and hence the arrangement of air conditioner unit, is selected
in such a way as to ensure good ventilation;
● The location is free from excessive dirt and moisture;
● The mains connection ratings, as stated on the name plate of the unit, are
available;
● The ambient temperature does not exceed +55°C;
● The packaging shows no signs of damage. Traces of oil on damaged packaging
are an indication of refrigerant loss and leakage in the unit system. Any damage
to the packaging may be the cause of subsequent malfunctions;
● After successful test and wire binding, the wire inlet of the equipment should be
hermetically sealed. Condensation will occur and cooling effect will reduce if the
cabinet is leaky;
● The distance of equipment from all obstacles around should not be less than
200mm;
● Air inlet and outlet are not obstructed on the inside of the cabinet;
● Air conditioner unit should only be fitted horizontally in the specified position.
Max. deviation from true horizontal:2º;
● To avoid an increase in condensation, the unit should be switch off immediately
when the equipment door is opened;
● Gaskets should be bonded to the fixing frame for the unit in door or wall of the
cabinet.
Service manual: TAC-12D-10
2/9

Hide quick links:

Advertisement

loading