Download Print this page

Dimplex CABKT10 Installation And Operating Instructions Manual page 5

Air barrier - recess kit

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
UK
Dimplex Air Barrier - Recess Kit
Models : CABKT10, CABKT15, DABKT10 & DABKT15
THESE INSTRUCTIONS SHOULD BE READ CAREFULLY AND RETAINED FOR FUTURE REFERENCE
Kit Reference
Suitable Models
CABKT10
CAB10E, CAB10W & CAB10A
CABKT15
CAB15E, CAB15W & CAB15A
DABKT10
DAB10E, DAB10W & DAB10A
DABKT15
DAB15E, DAB15W & DAB15A
The kit comprises of: -
·
1 egg crate grill assembly
·
1 recessed duct (unformed)
·
Duct endcaps
2 off (LH & RH) for CAB10\15 & DAB10
4 off for DAB15
·
Bag containing screws:
8 off for CAB10\15 & DAB10
14 off for DAB15
This installation instruction must be read in
conjunction with the instruction manual of the Air
Barrier being installed and form an addendum to that
document.
The kit is designed to facilitate installation of one of
the above Air Barrier models into a ceiling void.
The maximum effective height from floor to ceiling
into which the Air Barrier is being fitted is 2.5m for
the CAB series and 3.5m for the DAB series.
The ceiling can be either of a plasterboard (or similar)
construction, or of suspended 600 x 600mm tiles.
Installation in a plasterboard (or similar) Ceiling
First it is necessary to ensure that sufficient space exists above the
ceiling for the Installation of the Air Barrier
CAB10
CAB15
X
1205
1805
Y
605
605
Z
360 MIN.
360 MIN.
A hole as indicated in Fig. 1 must be cut into the ceiling, central to and
as close to the doorway as possible ( i.e. minimise 'W' - see Fig. 1).
It may be necessary to fix an internal supporting frame around the
newly cut aperture.
The grille frame 'a' can then be fixed in position (see Fig. 1).
Assembly of Recessed Duct Kit
Using the duct endcaps as a guide, form the duct by hand into
correct shape - see 'b' in Fig. 2. Screw fix the duct to endcaps using
the screws provided.
Finally bend up tabs as shown in Fig. 3.
In order to fit the Air Intake Duct, first remove outlet grille, bottom
panel and then the Intake grille assembly - as shown in Fig. 4 .
Refer to 'CAB/DAB Installation & Operating Instructions'.
The intake air duct can then be positioned using the tabs shown in
Fig. 3 and located in position as detailed in Fig. 5 using the supplied
screws fastened into the endcap.
Note: It is not necessary to replace the intake grille assembly.
(1)
(see Table 1 below).
Table 1
DAB10
DAB15
1205
1805
605
605
460 MIN.
460 MIN.
Installation and Operating Instructions
The Air Barrier can then be mounted into the ceiling void
(using lengths of threaded bar or hooks screwed into the threaded
inserts located in the top side of the appliance) with the Air Outlet
positioned centrally above the door as in the 'X' dimension and as
close to the supplied Grille Frame in the 'Z' dimension (150mm max.)
as shown in Fig.1.
The appliance is also required to be positioned as close to the door
opening as possible in the 'Y' dimension as shown in Fig. 1 and
inside the grille opening as shown in Fig. 6 to achieve optimum
air-flow effect.
The Air Barrier supplies (Electric or Water) are then made as per
'CAB/DAB Installation & Operating Instructions'.
The bottom panel and outlet grille can then be replaced, and the outlet
vanes positioned straight down.
The installation of the Air Barrier should be carried out by a
competent electrician and be in accordance with the current IEE
wiring regulations before re-inserting the egg crate grille into the
grille frame.
Installation in a Suspended Ceiling
First it is necessary to ensure that sufficient space exists above the
ceiling for the Installation of the Air Barrier - see Table 2.
CAB10
X
2 x Ceiling tiles
Y
1 x Ceiling tile
Z
360 MIN.
The required tile width needs to be left open (central to, and as close
as possible to the doorway i.e. with no central Ceiling tile support
bar).
The Air Barrier can then be installed in the ceiling void as detailed in
'Installation in a plasterboard Ceiling' and in the 'CAB/DAB Installation
& Operating Instructions'.
The egg crate grille core only may then be inserted directly into the
tile aperture left open.
Thermal Safety cut outs
The power supply to the heating elements will be interrupted if one
or a combination of the following abnormal events occur:
1.
Air intake duct or outlet grilles are obstructed.
2.
Internal ventilation is impaired due to build up of dust and
fluff.
3.
Blower unit stalls.
To reset the thermal safety cut-outs, access reset buttons (see 'x' in
Fig. 7) by removing the intake duct.
activation must be determined and corrective action taken.
Cleaning
WARNING: DISCONNECT SUPPLY before carrying out
maintenance.
External appearance can be maintained by wiping occasionally with
a damp cloth ; for stain removal, a weak soap solution can be applied
with a cloth and the surface wiped dry. Care must be taken to avoid
any moisture ingress into the product.
After Sales Service
Should you require after sales service, please get in touch with the
supplier through whom you purchased the appliance.
Table 2
CAB15
DAB10
3 x Ceiling tiles
2 x Ceiling tiles
1 x Ceiling tile
1 x Ceiling tile
360 MIN.
460 MIN.
Before re-setting the reason for
DAB15
3 x Ceiling tiles
1 x Ceiling tile
460 MIN.

Advertisement

loading

This manual is also suitable for:

Cabkt15Dabkt10Dabkt15