Greyhound 65074 Set Up, Operating, And Servicing Instructions page 13

30 ton log splitter
Table of Contents

Advertisement

Figure H
Clevis Pin (74)
3.
Raise the Log Lift and insert the
Clevis Pin (74) in the upper hole and
secure with R-pin (41) - See Figure
H.
Figure i
4.
Move the front leg up and secure it at
the second Pin hole. Insert the Push
Pin (42) to lock in place - See Figure
I.
5.
Do not drive faster than 55 MPH
when the Log Splitter is connected to
the vehicle.
SKU 65074
For technical questions, please call 1-800-444-3353.
Push Pin (42)
6.
Do not tow the Log Splitter on roads
or highways. This product is not
D.O.T. compliant, and is not road
legal.
7.
Before transporting, and at 500 mile
intervals during every trip, check and
tighten the Tire Lug Nuts to 85 - 90
Ft.-Lbs.
8.
Every 2,000 to 3,000 miles of travel,
lubricate the Hub Assemblies with a
heavy weight bearing grease. Follow
the Packing the Bearings Instructions
on page 7 of this manual. After each
Hub Assembly is reassembled,
tighten the Castle Nuts to 20-25 ft.
pounds, and rotate each tire several
turns to seat the bearing. Back off the
Castle Nut one half turn.
9.
Insert a new Cotter Pin (53) through
the Castle Nut and the hole in the
axle. Bend the Pin back, locking it
and the Nut in place.
Page 13

Advertisement

Table of Contents
loading

Table of Contents