1. Positive battery lead (red)
2. Negative battery lead (black)
3. Install the battery holding plate by installing
the nuts.
4. Install the front carrier by installing the bolts
and tightening them to the specified torques.
Tightening torques:
Carrier bolt (top):
26 Nm (2.6 m·kgf, 19 ft·lbf)
Carrier bolt (under the fenders):
7 Nm (0.7 m·kgf, 5.1 ft·lbf)
5. Install the panel.
EBU27751
Replacing a fuse
1
2
1. Fuse box
2. Main/EPS spare fuse
3. Main fuse
4. EPS fuse
5. Fuel injection system spare fuse
6. Fuel injection system fuse
8-57
8