Powrmatic RS Mk.II Series Installer's Instructions

Powrmatic RS Mk.II Series Installer's Instructions

Rs mk.ii series;

Advertisement

Quick Links

CONTENTS
1
DESCRIPTION OF THE BOILER . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . pag. 58
2
INSTALLATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . pag. 60
3
FEATURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . pag. 67
4
USE AND MAINTENANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . pag. 69
It is advisable to check the following before turning on the boiler for the first time:
– Check that there are no liquids or flammable materials in the immediate vicinity of the boiler.
– Check that electrical connections have been made correctly and that the ground wire is connected to a proper
grounding system.
– Open the gas cock and check the seal on connections, including the burner connection.
– Check that the boiler is set up to run on the type of gas available.
– Check that the flue through which the products of combustion are eliminated is free.
– Check that gate valves are open, if there are any.
– Check that the heating system has been filled with water and air has been bled out of it.
– Turn on the circulation pump, unless it is commanded by an automatic system.
– Bleed air out of the gas pipe using the pressure intake bleed valve located on the gas valve inlet.
– Check that none of the regulation, control and safety devices have been tampered with.
NOTE: When turning the generator back on, or if the boiler has not been used for some time, it is advisable to
bleed gas pipes for air. If this is not done, burner ignition may be delayed, possibly causing the boiler to shut
down. Wait at least 20 seconds from the time the indicator light comes on before releasing it.
If there is no voltage, the burner will shut down immediately. When the voltage is restored, the boiler will start
functioning again automatically. If gas pressure is insufficient, the device will shut down immediately, and the
signal for shutting down the equipment and the red gas pressure indicator light will come on.
If this occurs, the boiler cannot be started up using the device's release button, for safety reasons. The boiler
will be ignited automatically when the pressure returns to the minimum pressure setting on the gas pressure
switch (10 mbar).
INSTALLER'S INSTRUCTIONS
IMPORTANT

Advertisement

loading
Need help?

Need help?

Do you have a question about the RS Mk.II Series and is the answer not in the manual?

Questions and answers

Summary of Contents for Powrmatic RS Mk.II Series

  • Page 1 INSTALLER’S INSTRUCTIONS CONTENTS DESCRIPTION OF THE BOILER ................pag. 58 INSTALLATION .
  • Page 2: Description Of The Boiler

    DESCRIPTION OF THE BOILER 1. 1 INTRODUCTION the thermal power produced by 129,0 European standard EN 656. They can kW to 279. 1 kW. run on natural gas (methane), butane “RS Mk.II” boilers are hot water gene- They are designed and built in accor- (G30) or propane (G31).
  • Page 3 SHIPPING PACK N. 2 • gas pressure switch Wooden crate containing: • pressure intake “RS Mk.II” thermal units are supplied – flue gas chamber to be assembled • second gas solenoid valve in three separate packs: – cardboard box containing skirt –...
  • Page 4 INSTALLATION The boiler must be installed in a fixed location and only by specialized and qualified firms in compliance with all instructions contained in this manual. Furthermore, the installation must be in accordance with current standards and regulations. 2. 1 BOILER ROOM AND VENTILATION The “RS Mk.II”...
  • Page 5 – sealed against products of combu- the action of products of combu- choking throughout its length; stion, waterproof and heat insulated; stion and condensation produced by – adequately insulated to prevent con- – made of materials which can resist them over time; densation or cooling of flue gases, normal mechanical stress, heat and –...
  • Page 6 – Prepare components by cleaning the housings of the conical nipples with thinner. – Introduce the plaster seam into the groove provided for the flue gas seal, pressing gently (fig. 5). – Prepare one of the two intermediate heating elements with a 1/2” perfo- rated stud, lubricating the conical nip- ples with boiled linseed oil before introducing them (fig.
  • Page 7 the generator. If it is necessary to move it to the left side, check that the 1 Boiler body two rows of holes in the distributor 2 Burner are directed upwards and toward the 3 Burner manifold front of the boiler (fig. 8). 4 TCB M5 x 8 screw 5 Aluminium...
  • Page 8 – Position the lower front wall (11) by fitting it in between the screws on t he bur ner manif old suppor t brackets and the cast iron body; anchor the walls to panels (6) and (9) with two 7SP x 1/2” self-tapping screws.
  • Page 9 2. 1 5 ELECTRICAL CONNECTION The electrical power supply must be connected to terminals L and N and to the panel complying with all phase 1 Ignition electrode and neutral positions as shown in 2 M5 x 15 stud bolt the diagram.
  • Page 10 2. 1 6 RVA43.222 CONTROL UNIT (optional) 1 Plastic hole cover 2 Optional control unit All boiler functions can be controlled by the optional contr ol unit code 8096303, supplied with an outdoor temperature probe (SE) and boiler immersion probe (SC) (fig. 14). Use of the control unit requires connection of an additional series of low voltage con- nectors for connection of probes and...