Lehner Liftechnik Omega Installation Manual page 11

Table of Contents

Advertisement

• At the bottom, use some clean paper
to protect the rope against dust!
• Now feed the tension (upper) rope
into the upper tube.
Lubricate each ball lightly as it
goes into the tube except for the
first three; this will remove debris
from the tube before it is trapped in
the grease. Pull the rope out of the
lower end and complete the
connection of the end parts.
Note: It is particularly important to
lubricate long lifts.
• Feed the lower rope through the arrestor section.
• Complete the ends of both ropes with the rope levers shown in the illustration below.
1.
tension rope
2.
support rope
3.
sliding contact
4.
plastic part
5.
metal half ring
6.
rope lever
7.
secure ring
8.
plastic cover
Omega platform lift
OMEGA
Installation Manual
Edition Dec. 2004
9.
plastic ring (distance)
10.
plastic part
11.
rope lever
12.
rope clamping system
13.
plastic part
14.
plastic part
15.
rope clamp
16.
plastic tube
page 10 of 24

Advertisement

Table of Contents
loading

Related Products for Lehner Liftechnik Omega

Table of Contents